      <item>
         <title>Day 2 (18/03/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372122512</link>
         <description><![CDATA[<p><strong>Public Holiday</strong></p><ul><li><p>No work conducted due to a public holiday.</p></li><li><p>Used the time to review internship briefing materials and prepare for upcoming tasks.</p></li></ul>]]></description>
         <enclosure url="https://padlet-uploads.storage.googleapis.com/2444312781/3e5c36ae044c50f90b312eee28aa0903/image.png" />
         <pubDate>2025-03-19 00:54:13 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372122512</guid>
      </item>
      <item>
         <title>Day 4 (20/03/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372122789</link>
         <description><![CDATA[<p><strong>Check-In and Task Review</strong></p><ul><li><p>Checked in and reviewed feedback from the previous day with the supervisor.</p></li></ul><p><strong>Amendments on Store Layout (AutoCAD)</strong></p><ul><li><p>Continued working on the same store layout task.</p></li><li><p>Made necessary amendments using AutoCAD based on supervisor and senior staff feedback.</p></li><li><p>Adjusted dimensions, rearranged elements for better space utilization, and improved accuracy.</p></li></ul><p><strong>Discussion and Feedback Session</strong></p><ul><li><p>Discussed the updated layout with seniors and supervisor.</p></li><li><p>Received further input for fine-tuning.</p></li></ul><p><strong>Resubmission of Layout</strong></p><ul><li><p>Submitted the revised layout drawing for final review and approval.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-03-19 00:54:24 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372122789</guid>
      </item>
      <item>
         <title>Day 5 (21/03/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372122948</link>
         <description><![CDATA[<p><strong>Refinement of Previous Store Layout (AutoCAD)</strong></p><ul><li><p>Continued working on the previous store layout project.</p></li><li><p>Refined the layout further based on final feedback received from the supervisor.</p></li><li><p>Focused on correcting minor alignment issues and optimizing space planning.</p></li></ul><p><strong>AutoCAD Drafting – New Layout</strong></p><ul><li><p>Started drafting the new store layout using AutoCAD.</p></li><li><p>Completed the base layout including walls, key fixtures, and major zones.</p></li></ul><p><strong>Initial Review with Supervisor</strong></p><ul><li><p>Presented the initial draft of the new layout for feedback.</p></li><li><p>Supervisor highlighted areas for improvement, to be continued the next week.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-03-19 00:54:28 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372122948</guid>
      </item>
      <item>
         <title>Day 1  (24/03/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372124732</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance as usual.</p></li></ul><p><strong>Continuation of New Layout Drawing</strong></p><ul><li><p>Continued working on the store layout project using AutoCAD.</p></li><li><p>Focused on completing remaining sections including fixture placements and customer flow areas.</p></li></ul><p><strong>Design Adjustment Based on Previous Feedback</strong></p><ul><li><p>Made refinements to the base layout as instructed by the supervisor.</p></li><li><p>Adjusted spacing, line weights, and overall layout clarity for better presentation.</p></li></ul><p><strong>Progress Submission</strong></p><ul><li><p>Submitted the updated drawing to the supervisor for feedback and further review.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-03-19 00:55:41 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372124732</guid>
      </item>
      <item>
         <title>Day 2 (25/03/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372124819</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to the office and checked in for the day.</p></li></ul><p><strong>Department Meeting and Weekly Task Discussion</strong></p><ul><li><p>Attended the weekly department meeting with the project general manager and team members.</p></li><li><p>Discussed current project statuses, upcoming deadlines, and individual task assignments.</p></li><li><p>Took note of important project changes and expectations for drawing submission timelines.</p></li></ul><p><strong>Feedback Review and Task Briefing</strong></p><ul><li><p>Received feedback from the supervisor on the layout drawing submitted the previous day.</p></li><li><p>Supervisor highlighted necessary changes regarding layout alignment and proportion consistency.</p></li></ul><p><strong>Layout Refinement Using AutoCAD</strong></p><ul><li><p>Made amendments on the store layout drawing based on the latest feedback.</p></li><li><p>Focused on improving accuracy in spacing, wall structure, and fixture placement.</p></li></ul><p>&nbsp;</p>]]></description>
         <enclosure url="" />
         <pubDate>2025-03-19 00:55:45 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372124819</guid>
      </item>
      <item>
         <title>Day 3 (26/03/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372125069</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>AutoCAD Layout Update – Furniture &amp; Fixtures</strong></p><ul><li><p>Continued working on the previous store layout drawing.</p></li><li><p>Added furniture and fixtures such as counters, racks, shelves, and display units into previously empty sections.</p></li><li><p>Ensured correct scaling and placement based on project guidelines and site drawing proportions.</p></li></ul><p><strong>Learning Printer Usage</strong></p><ul><li><p>Learned how to properly set up and use the office printer for technical drawings.</p></li><li><p>Gained experience in adjusting printing settings, paper sizes, and plotting from AutoCAD.</p></li></ul><p><strong>Supervisor Review</strong></p><ul><li><p>Submitted the printed layout for supervisor comments.</p></li><li><p>Received minor feedback to fine-tune fixture spacing and line weights.</p></li></ul><p><strong>Preparation for Next Task</strong></p><ul><li><p>Started preparing the drawing file for the next store project.</p></li><li><p>Collected new site info and drawing references for upcoming task.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-03-19 00:55:56 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372125069</guid>
      </item>
      <item>
         <title>Day 4 (27/03/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372125148</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to the office and marked attendance.</p></li></ul><p><strong>Continuation of New Layout Drawing</strong></p><ul><li><p>Continued working on the new store layout using AutoCAD.</p></li><li><p>Focused on completing structural elements and started planning zoning for different sections of the store.</p></li><li><p>Ensured accurate dimensions based on the site drawing provided and coordinated spacing for ease of movement.</p></li></ul><p><strong>Supervisor Review &amp; Minor Corrections</strong></p><ul><li><p>Submitted the updated layout to the supervisor.</p></li><li><p>Made minor corrections as instructed, mainly involving fixture adjustments and spacing tweaks.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-03-19 00:56:00 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372125148</guid>
      </item>
      <item>
         <title>Day 5 (28/03/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372125263</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Learning Company Drawing Standards</strong></p><ul><li><p>Observed how layout drawings are structured from the base (walls and partitions) up to the placement of fixtures and furniture.</p></li><li><p>Studied existing drawing samples for reference on layer usage, annotation styles, and line types.</p></li></ul><p><strong>Practice from Empty Layout to Complete Drawing</strong></p><ul><li><p>Practiced creating a layout from scratch using AutoCAD, starting with an empty base.</p></li><li><p>Gradually added walls, zoning, and detailed fixture &amp; furniture placement according to company standards.</p></li></ul><p><strong>Supervisor Guidance and Review</strong></p><ul><li><p>Received guidance from supervisor throughout the drawing process.</p></li><li><p>Supervisor provided feedback and highlighted areas for further refinement to match company expectations.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-03-19 00:56:05 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372125263</guid>
      </item>
      <item>
         <title>Day 1 (31/03/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372125634</link>
         <description><![CDATA[<p><strong>Public Holiday – Hari Raya Aidilfitri</strong></p><ul><li><p>No work conducted due to Hari Raya Aidilfitri holiday.</p></li><li><p>Holiday granted as per company and national calendar.</p></li></ul>]]></description>
         <enclosure url="https://padlet-uploads.storage.googleapis.com/2444312781/01b5783fa5c2ff07933f08360fb8d151/image.png" />
         <pubDate>2025-03-19 00:56:19 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372125634</guid>
      </item>
      <item>
         <title>Day 2 (01/04/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372125760</link>
         <description><![CDATA[<p><strong>Public Holiday – Hari Raya Aidilfitri</strong></p><ul><li><p>Continued Hari Raya Aidilfitri holiday.</p></li><li><p>No official tasks or duties carried out.</p></li></ul>]]></description>
         <enclosure url="https://padlet-uploads.storage.googleapis.com/2444312781/3e9dfba402f2bc70cf79db5737bc3d62/image.png" />
         <pubDate>2025-03-19 00:56:24 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372125760</guid>
      </item>
      <item>
         <title>Day 3 (02/04/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372125847</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Independent Project Work</strong></p><ul><li><p>Assigned to continue the layout drawing task independently.</p></li><li><p>Reviewed the site reference and previous drawing instructions before starting.</p></li></ul><p><strong>Fixture &amp; Furniture Planning</strong></p><ul><li><p>Planned the arrangement of key furniture and fixtures such as cashier counters, gondolas, and display shelves.</p></li><li><p>Focused on maintaining proper customer flow and spacing in accordance with layout guidelines.</p></li></ul><p><strong>Cross-Check with Existing Drawings</strong></p><ul><li><p>Referred to previous approved layouts to ensure consistency with company standards.</p></li><li><p>Verified scale, dimensioning format, and component placement.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-03-19 00:56:27 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372125847</guid>
      </item>
      <item>
         <title>Day 4 (03/04/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372126617</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Focus on Furniture &amp; Fixture Drawing</strong></p><ul><li><p>Dedicated the day to detailing furniture and fixture elements in the store layout.</p></li><li><p>Ensured accurate sizing and positioning based on provided references and company drawing standards.</p></li></ul><p><strong>Cross-Referencing with Standard Blocks</strong></p><ul><li><p>Referred to company’s block library for standard fixture designs.</p></li><li><p>Inserted and aligned blocks according to the planned layout.</p></li></ul><p><strong>Progress Check with Senior</strong></p><ul><li><p>Requested senior staff to briefly review progress and confirm alignment with project direction.</p></li><li><p>Noted minor feedback for adjustments to be made on the next day.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-03-19 00:56:56 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372126617</guid>
      </item>
      <item>
         <title>Day 5 (04/04/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372126715</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Study of Company’s Latest Design Concept</strong></p><ul><li><p>Spent the day reviewing the company’s updated design concept guidelines for store layouts.</p></li><li><p>Focused on understanding visual branding, layout zoning strategies, color usage, and fixture design direction.</p></li></ul><p><strong>Note-Taking and Discussion</strong></p><ul><li><p>Took notes on key design elements, including customer flow logic, lighting placement, and display organization.</p></li><li><p>Had a short discussion with senior designer to clarify the implementation of certain design elements in upcoming projects.</p></li></ul><p><strong>Preparation for Next Task</strong></p><ul><li><p>Organized drawing files and resources in preparation for applying the updated concept in future layout work.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-03-19 00:57:00 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372126715</guid>
      </item>
      <item>
         <title>Day 1 (07/04/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372130500</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Continuation from Previous Task</strong></p><ul><li><p>Continued with layout preparation using AutoCAD based on the latest design concept learned last week.</p></li></ul><p><strong>Drawing Setup and Organization</strong></p><ul><li><p>Organized layers, line types, and title block according to company standards.</p></li><li><p>Prepared the drawing file for efficient fixture and furniture placement in the following steps.</p></li></ul><p><strong>Reference Drawing Study</strong></p><ul><li><p>Studied reference drawings to ensure alignment with the current project requirements.</p></li><li><p>Focused on understanding the typical layout flow and key design patterns.</p></li></ul><p><strong>Progress Ready for Feedback</strong></p><ul><li><p>Completed initial layout setup and saved the file for review and further development after team discussion on the next day.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-03-19 00:59:23 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372130500</guid>
      </item>
      <item>
         <title>Day 2 (08/04/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372130603</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Weekly Department Meeting</strong></p><ul><li><p>Attended the weekly meeting with supervisor and project team.</p></li><li><p>Discussed project progress, and deadlines.</p></li><li><p>Received feedback and additional instructions for the current layout drawing task.</p></li></ul><p><strong>Layout Drawing Improvement</strong></p><ul><li><p>Refined the layout structure based on meeting input.</p></li><li><p>Adjusted zoning and flow to improve customer navigation and comply with updated design concept.</p></li></ul><p><strong>Furniture &amp; Fixture Placement</strong></p><ul><li><p>Continued placing furniture and fixture elements in the layout using AutoCAD.</p></li><li><p>Focused on maximizing space efficiency while keeping the layout visually balanced.</p></li></ul><p><strong>Progress Review with Senior</strong></p><ul><li><p>Updated senior on current progress.</p></li><li><p>Received minor comments for improvement, to be applied in the next day’s task.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-03-19 00:59:26 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372130603</guid>
      </item>
      <item>
         <title>Day 3 (09/04/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372130684</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Revision Based on Feedback</strong></p><ul><li><p>Made necessary adjustments to the store layout as per senior’s comments from the previous day.</p></li><li><p>Focused on fixture spacing, alignment, and improving accessibility between key sections of the store.</p></li></ul><p><strong>Detailing Furniture and Fixture Blocks</strong></p><ul><li><p>Adjusted scale and orientation to match real-life proportions and ensure the layout’s practicality.</p></li></ul><p><strong>Layer and Annotation Management</strong></p><ul><li><p>Reviewed and organized layers for better clarity and drawing consistency.</p></li><li><p>Added basic annotations and labels to identify fixture types and zones.</p></li></ul><p><strong>Saved Updated Progress for Next Review</strong></p><ul><li><p>Completed current round of updates and saved the file for further enhancement and final review.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-03-19 00:59:29 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372130684</guid>
      </item>
      <item>
         <title>Day 4 (10/04/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372130906</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Final Touch-Up on Layout Drawing</strong></p><ul><li><p>Focused on refining the final details of the store layout drawing.</p></li><li><p>Checked overall drawing alignment, dimensions, and consistency with company standards.</p></li></ul><p><strong>Drawing Clean-Up</strong></p><ul><li><p>Removed unnecessary lines, corrected layer misplacements, and ensured tidy presentation of the final layout.</p></li></ul><p><strong>Cross-Check Against Reference</strong></p><ul><li><p>Compared the completed layout against original site measurements and existing project standards.</p></li><li><p>Verified that all key elements like cashier counters, entrance, and product zones were correctly placed.</p></li></ul><p><strong>Preparation for Supervisor Checking</strong></p><ul><li><p>Saved and organized the completed layout, getting it ready for formal review and feedback by supervisor.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-03-19 00:59:37 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372130906</guid>
      </item>
      <item>
         <title>Day 5 (11/04/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372131001</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Supervisor Review Session</strong></p><ul><li><p>Submitted the completed layout drawing to the supervisor for checking.</p></li><li><p>Supervisor reviewed the overall design, layout flow, fixture arrangement, and compliance with the latest design guidelines.</p></li></ul><p><strong>Amendments Based on Feedback</strong></p><ul><li><p>Quickly made the necessary corrections in the layout drawing using AutoCAD.</p></li><li><p>Updated annotations, adjusted a few fixture positions, and corrected minor layer issues.</p></li></ul><p><strong>File Finalization</strong></p><ul><li><p>Saved the corrected and finalized layout drawing for record.</p></li><li><p>Prepared and organized working files for the next assigned project.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-03-19 00:59:40 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372131001</guid>
      </item>
      <item>
         <title>Day 1  (14/04/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372131189</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>New Project Briefing</strong></p><ul><li><p>Received a new layout drawing task from supervisor.</p></li><li><p>Briefed on project requirements, including site measurements, and, zoning.</p></li></ul><p><strong>Drawing Setup</strong></p><ul><li><p>Created a new AutoCAD file based on the provided site plan.</p></li><li><p>Set up layers, title blocks, and scaled layout according to company standards.</p></li></ul><p><strong>Initial Wall and Zoning Layout</strong></p><ul><li><p>Started drawing the existing wall structures based on the site measurement provided. </p></li><li><p>Ensured dimension accuracy and flow consistency with the site information.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Completed basic structure setup and saved for continuation on the next day.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-03-19 00:59:47 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372131189</guid>
      </item>
      <item>
         <title>Day 2 (15/04/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372131431</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Fixture and Furniture Planning</strong></p><ul><li><p>Continued placing fixture and furniture elements in the existing layout</p></li><li><p>Used standard blocks from company library and arranged based on experience that gained from previous drawing.</p></li></ul><p><strong>Weekly Department Meeting</strong></p><ul><li><p>Attended the weekly meeting with the supervisor and project team.</p></li><li><p>Presented the layout drawing completed last week for review.</p></li><li><p>Discussed overall project progress, received design feedback, and clarified expectations for the current task.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Saved the updated drawing for continuation and feedback on the next day.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-03-19 00:59:56 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372131431</guid>
      </item>
      <item>
         <title>Day 3 (16/04/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372131500</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Drawing Amendment Based on Feedback</strong></p><ul><li><p>Worked on revising the layout drawing that was submitted and discussed during yesterday’s department meeting.</p></li><li><p>Adjusted fixture positions, improved spacing, and updated certain zones as per feedback from supervisor and team members.</p></li></ul><p><strong>Annotation and Layer Refinement</strong></p><ul><li><p>Edited annotations for better clarity and updated layer naming to match company drawing standards.</p></li><li><p>Ensured all furniture and fixture blocks were correctly placed and labeled.</p></li></ul><p><strong>Final Touches</strong></p><ul><li><p>Cleaned up the drawing by removing unnecessary elements and checking dimensions.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Saved the revised drawing and prepared it for internal review on the next day.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-03-19 01:00:00 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372131500</guid>
      </item>
      <item>
         <title>Day 4 (17/04/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372131607</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Internal Review and Minor Fixes</strong></p><ul><li><p>Submitted the revised drawing for internal checking by a senior team member.</p></li><li><p>Received a few minor comments related to fixture alignment and block consistency.</p></li></ul><p><strong>Drawing Adjustments</strong></p><ul><li><p>Made quick adjustments to fixture positions and ensured all layers followed the standard naming format.</p></li><li><p>Checked for uniform spacing and overall neatness across the layout.</p></li></ul><p><strong>Finalization of Layout</strong></p><ul><li><p>Finalized the drawing after applying all corrections.</p></li><li><p>Confirmed that all annotations, dimensions, and elements met company requirements.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Saved the final version and organized the files for senior submission.</p></li><li><p>Email all the documents to senior for checking.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-03-19 01:00:03 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372131607</guid>
      </item>
      <item>
         <title>Day 5 (18/04/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372131703</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>First Attempt on Painting Layout Drawing</strong></p><ul><li><p>Assigned to try painting layout for the first time by referring to a completed drawing from a senior team member.</p></li><li><p>Reviewed the reference drawing to understand how to draw the painting drawing, color zoning, and labeling style.</p></li></ul><p><strong>Start Preparing New Site Drawing</strong></p><ul><li><p>After completing the painting layout draft and submitted to senior, began preparing a new site drawing assigned by last team meeting.</p></li><li><p>Checked provided site measurements and started setting up the AutoCAD file with basic structure and layout plan.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Saved ongoing work and prepared to continue on the following week.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-03-19 01:00:07 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372131703</guid>
      </item>
      <item>
         <title>Details of student</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372148066</link>
         <description><![CDATA[<p><strong>Name</strong>: Winson Chew Pooi Sheng</p><p><br/></p><p><strong>Matric Number</strong>: 285728</p><p><br/></p><p><strong>Course</strong>: Bachelor of Technology Management with Honours</p><p><br/></p><p><strong>Phone Number</strong>: 011-1666 4104</p><p><br/></p><p><strong>Email</strong>: <a rel="noopener noreferrer nofollow" href="mailto:winson_chew_pooi@stml.uum.edu.my">winson_chew_pooi@stml.uum.edu.my</a></p><p><br/></p><p><strong>University supervisor</strong>: Prof. Madya Ts. Dr Nurul Azita binti Salleh</p><p><br/></p><p><strong>Practicum Period</strong>: 16/03/25-19/09/25 (6 months)</p>]]></description>
         <enclosure url="" />
         <pubDate>2025-03-19 01:08:44 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372148066</guid>
      </item>
      <item>
         <title>Company</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372157436</link>
         <description><![CDATA[<p><strong>Company Name</strong>: Eco-Shop Marketing Berhad</p><p><br></p><p><strong>Company Address</strong>: L1-02, L1-03 &amp; L1-04, Level 1,, Wisma LYL,, No.12, Jalan 51A/223, Seksyen 51A,, 46100 Petaling&nbsp;Jaya,&nbsp;Selangor.</p><p><br></p><p><strong>Company Supervisor</strong>: Loo Siew Foong</p><p><br></p><p><strong>Designation</strong>: Senior Manager, Project &amp; Design</p><p><br></p><p><strong>Telephone</strong>: 014-948 5502</p><p><br></p><p><strong>Email</strong>: <a rel="noopener noreferrer nofollow" href="mailto:chris.loo@eco-shop.com.my">chris.loo@eco-shop.com.my</a></p><p><br></p>]]></description>
         <enclosure url="https://padlet-uploads.storage.googleapis.com/2444312781/30d76838f76ef8403cb57931e85c05b2/Eco_Shop_1_0.png" />
         <pubDate>2025-03-19 01:12:39 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3372157436</guid>
      </item>
      <item>
         <title>Day 1 (21/04/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3426575114</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Continue Site Drawing Preparation</strong></p><ul><li><p>Continued working on the new site layout started last week.</p></li><li><p>Refined wall alignment and adjusted dimensions to ensure accuracy based on the measurement details provided.</p></li></ul><p><strong>Zoning and Space Planning</strong></p><ul><li><p>Began initial zoning of the store, identifying main areas such as entrance, cashier, gondola sections, and utility spaces.</p></li></ul><p><strong>Fixture Placement Planning</strong></p><ul><li><p>Sketched rough positions for major fixtures to visualize the store flow.</p></li><li><p>Followed company standard layout references for spacing and organization.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Saved and sent the updated layout drawing for review and to continue with detailed fixture placement on the next day.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-04-27 14:39:33 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3426575114</guid>
      </item>
      <item>
         <title>Day 2 (22/04/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3426575177</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Zoning Improvement Based on Senior Feedback</strong></p><ul><li><p>Started the day by revising the zoning layout based on feedback from senior team members.</p></li></ul><p><strong>Weekly Department Meeting</strong></p><ul><li><p>Attended the department meeting with the supervisor and project team.</p></li><li><p>Received additional feedback and suggestions for further adjustments to optimize the flow and fixture placement.</p></li><li><p>Learning new knowledge based on senior drawing.</p></li></ul><p><strong>Drawing Update and Review Preparation</strong></p><ul><li><p>Made final tweaks to the zoning layout based on feedback received during the meeting.</p></li><li><p>Reviewed the updated layout to ensure it matched the project’s expectations.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Saved the updated drawing and prepared it for further detailing in the coming days.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-04-27 14:39:39 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3426575177</guid>
      </item>
      <item>
         <title>Day 3 (23/04/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3426575225</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Detailed Fixture Placement</strong></p><ul><li><p>Started placing the major fixtures and furniture in the updated layout based on the improved zoning.</p></li><li><p>Focused on aligning gondolas, display counters, and nest table fixture for better flow.</p></li></ul><p><strong>Layer and Block Management</strong></p><ul><li><p>Ensured all fixtures were placed using proper AutoCAD blocks and layers.</p></li><li><p>Checked the fixture dimensions and spacing to ensure everything was consistent with the design guidelines.</p></li></ul><p><strong>Adjustments Based on Flow</strong></p><ul><li><p>Made further adjustments to fixture positioning to enhance the store's layout flow, ensuring accessibility between different sections.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Saved the updated layout and fixture placement for internal review.</p></li><li><p>Prepared the drawing for the next round of feedback.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-04-27 14:39:44 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3426575225</guid>
      </item>
      <item>
         <title>Day 4 (24/04/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3426575307</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Drawing Review and Refinement</strong></p><ul><li><p>Reviewed the fixture and layout drawing from the previous day for any inconsistencies or areas for improvement.</p></li><li><p>Made minor adjustments to the fixture placements for better alignment and customer navigation.</p></li></ul><p><strong>Feedback from Senior Team Member</strong></p><ul><li><p>Submitted the drawing for review by a senior team member.</p></li><li><p>Received feedback regarding a few small fixture alignment issues.</p></li></ul><p><strong>Drawing Updates</strong></p><ul><li><p>Made the suggested corrections and fine-tuned the drawing to ensure everything was properly aligned and ready for the next phase of the project.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Saved the updated and refined layout for further team review.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-04-27 14:39:50 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3426575307</guid>
      </item>
      <item>
         <title>Day 5 (25/04/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3426575376</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Finalizing Layout and Fixture Placement</strong></p><ul><li><p>Completed the final adjustments to the layout and fixture placements based on last week's feedback.</p></li><li><p>Ensured everything was aligned properly, with correct spacing between fixtures and well-organized zones.</p></li></ul><p><strong>Preparation for Submission</strong></p><ul><li><p>Prepared the finalized drawing for supervisor submission.</p></li><li><p>Checked all annotations, dimensions, and references to ensure they were accurate and properly formatted.</p></li></ul><p><strong>Saving and Organizing Files</strong></p><ul><li><p>Saved the final drawing in the project folder, organized the file for handover, and ensured everything was properly named and filed according to company protocols.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Completed the drawing preparation and saved the final version for review.</p></li><li><p>Printed and planned to submit it for final approval next week.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-04-27 14:39:55 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3426575376</guid>
      </item>
      <item>
         <title>Day 1 (28/04/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3426575431</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Final Checking of Previous Drawing</strong></p><ul><li><p>Began the day by performing final checks on the layout drawing completed last week.</p></li><li><p>Ensured the drawing met company standards and was ready for presentation.</p></li></ul><p><strong>New Site Drawing Preparation</strong></p><ul><li><p>After completing the review, continued drafting a new site layout based on the latest assignment.</p></li><li><p>Plotted external and internal existing walls based on site photo and site measurement.</p></li></ul><p><strong>Weekly Department Meeting (2:00 PM)</strong></p><ul><li><p>Presented the finalized previous drawing for team feedback and reviewed progress on the new site plan.</p></li><li><p>Noted suggestions for zoning and fixture improvements in the new layout.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Submitted and saved both the revised drawing and new layout draft for further development.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-04-27 14:40:02 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3426575431</guid>
      </item>
      <item>
         <title>Day 2 (29/04/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3426575507</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Refinement for Previous Drawing</strong></p><ul><li><p>Started the day by focusing on refinement to improve the previous site layout based on feedback from the yesterday’s meeting.</p></li></ul><p><strong>Fixture and Furniture Planning</strong></p><ul><li><p>Started planning the position of major fixtures and furniture within each zone.</p></li><li><p>Tried several layout options based on previous project samples.</p></li><li><p>Submitted the options to a senior team member for input and feedback.</p></li></ul><p><strong>Review and Internal Feedback</strong></p><ul><li><p>Submitted the updated drawing for internal checking by a senior team member.</p></li><li><p>Noted a few suggestions regarding spacing and labeling for further refinement.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Saved the drawing and planned to finalize fixture placement and detailing in the next session.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-04-27 14:40:09 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3426575507</guid>
      </item>
      <item>
         <title>Day 3 (30/04/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3426575579</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Refining Zoning Layout</strong></p><ul><li><p>Continued working on the new layout by improving one of the zoning options selected based on senior feedback.</p></li></ul><p><strong>Fixture &amp; Furniture Placement</strong></p><ul><li><p>Focused on detailing the placement of gondolas, shelving units, and feature displays within each zone.</p></li><li><p>Maintained alignment with company layout standards and ensured functional use of space.</p></li></ul><p><strong>Internal Review Preparation</strong></p><ul><li><p>Prepared the updated version for internal review by ensuring clean layering, proper labeling, and dimension accuracy.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Saved the refined layout and planned to finalize the remaining detailing in the next session.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-04-27 14:40:15 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3426575579</guid>
      </item>
      <item>
         <title>Day 4 (01/05/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3426575639</link>
         <description><![CDATA[<p><strong>Public Holiday – Labour Day</strong></p><ul><li><p>No work activities were carried out today as the company observed <strong>Labour Day</strong>.</p></li></ul>]]></description>
         <enclosure url="https://padlet-uploads.storage.googleapis.com/2444312781/7a306decad9805393eb62eaa08690a86/image.png" />
         <pubDate>2025-04-27 14:40:20 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3426575639</guid>
      </item>
      <item>
         <title>Day 5 (02/05/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3426576594</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Printing and Reviewing Layout</strong></p><ul><li><p>Printed out the updated layout drawing with fixture rearrangements based on senior feedback.</p></li></ul><p><strong>Discussion with Senior on Layout Options</strong></p><ul><li><p>Discussed the different layout options provided earlier in the week.</p></li><li><p>Received final feedback on the arrangement of fixtures and spaces, with recommendations for minor tweaks to further optimize flow and functionality.</p></li><li><p>Explored alternative ideas for better fixture utilization and customer experience.</p></li></ul><p><strong>Revised Layout Based on Feedback</strong></p><ul><li><p>Made necessary adjustments to the layout based on the discussion, ensuring all suggestions were incorporated.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Saved the updated drawing, ready for final approval and further detailing in the next stages of the project.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-04-27 14:40:41 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3426576594</guid>
      </item>
      <item>
         <title>Day 1 (05/05/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3440670206</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Revision of Previous Project Layout</strong></p><ul><li><p>Started the day by continuing revisions on the previous layout drawing based on final comments received last week.</p></li><li><p>Adjusted fixture positions and labeling to improve clarity and ensure compliance with company design standards.</p></li></ul><p><strong>New Project Assignment – Drawing Preparation</strong></p><ul><li><p>Began work on a new layout project assigned by the supervisor.</p></li><li><p>Started by studying the existing layout plan and the architectural floor plan to understand the store structure, dimensions, and zoning potential.</p></li><li><p>This was my first time working directly with an architectural plan, so I took time to analyze key elements such as columns, walls, entrances, and service areas.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Completed layout revisions and started organizing the base setup for the new project in AutoCAD.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-08 00:05:24 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3440670206</guid>
      </item>
      <item>
         <title>Day 2 (06/05/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3440678265</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Discussion on Architectural Plan</strong></p><ul><li><p>Started the day with a focused discussion with a senior team member regarding the architectural plan used in the new project.</p></li></ul><p><strong>Presentation to Team</strong></p><ul><li><p>presented the drawing completed on <strong>Week 8 Day 1</strong> to the team for review.</p></li><li><p>The drawing was based on the architectural layout and included initial zoning and structural alignment.</p></li><li><p>Received feedback requiring updates</p><ul><li><p>Informed that the drawing needed to be updated with the latest site measurement for accuracy.</p></li><li><p>Planned the necessary adjustments based on updated dimensions.</p></li></ul></li></ul><p><strong>Task Briefing by General Manager</strong></p><ul><li><p>During the team discussion, the General Manager provided a revised task list for the upcoming days.</p></li><li><p>Outlined new responsibilities and expected deliverables for each project member moving forward.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Noted required drawing revisions and prepared to update the layout in the next session.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-08 00:11:00 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3440678265</guid>
      </item>
      <item>
         <title>Day 3 (07/05/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3440684992</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Drawing Update with Latest Site Measurements</strong></p><ul><li><p>Started the day by updating the layout drawing with the latest site measurement provided.</p></li><li><p>Revised wall alignments, structural details, and overall store dimensions to ensure accuracy based on actual site data.</p></li></ul><p><strong>Zoning Rearrangement</strong></p><ul><li><p>Rearranged the store zoning layout to reflect the changes in measurements and improve overall space planning.</p></li><li><p>Adjusted the placement of key areas such as customer staircase, display zones, and customer circulation paths.<br>Ensured the zoning followed company design principles and matched functional requirements for the site.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Saved the updated drawing for further detailing and prepared to proceed with fixture planning in the next session.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-08 00:14:38 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3440684992</guid>
      </item>
      <item>
         <title>Day 4 (08/05/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3443244896</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Finalized Updated Layout</strong></p><ul><li><p>Continued and completed the zoning and dimension updates from the previous day.</p></li><li><p>Double-checked measurements and zoning flow to ensure alignment with the latest site data.</p></li><li><p>Reviewed the overall layout to confirm accuracy before submitting to senior.</p></li></ul><p><strong>Started New Project – Sungai Petai, Alor Gajah, Melaka Store</strong></p><ul><li><p>Received a new drawing task for a store located in Melaka.</p></li><li><p>Started by reviewing the provided architectural plan and site measurement for reference.</p></li><li><p>Began setting up a new file in company database, set up an AutoCAD file with title block.</p></li><li><p>Outlined initial wall structures and started planning basic zoning.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Saved both the finalized layout and the new project setup for further development.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-09 07:53:31 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3443244896</guid>
      </item>
      <item>
         <title>Day 5 (09/05/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3443247948</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Zoning for New Melaka Store</strong></p><ul><li><p>Continued work on the new store layout for the Melaka site.</p></li><li><p>Focused on zoning the floor plan by identifying and allocating areas for key functions such as utility, display, cashier, toilet, and circulation paths.</p></li><li><p>Ensured the zoning followed company standards and considered both functionality and customer flow.</p></li></ul><p><strong>Fixture and Furniture Placement</strong></p><ul><li><p>Started placing fixtures and furniture into the drawing based on the defined zones.</p></li><li><p>Referred to past projects and company guidelines for standard fixture sizing and arrangement.</p></li><li><p>Placed shelving units, counters, and key furniture elements to begin shaping the store layout.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Saved the updated Melaka layout for review and further refinement in the coming week.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-09 07:56:21 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3443247948</guid>
      </item>
      <item>
         <title>Day 1 (12/05/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447253658</link>
         <description><![CDATA[<p><strong>Public Holiday – Wesak Day</strong></p><ul><li><p>No work activity conducted today as the company observed Wesak Day.</p></li></ul>]]></description>
         <enclosure url="https://padlet-uploads.storage.googleapis.com/2444312781/1f43f597d8298a97e06cea344d55695e/image.png" />
         <pubDate>2025-05-13 00:05:29 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447253658</guid>
      </item>
      <item>
         <title>Day 2 (13/05/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447254060</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Furniture and Fixture Placement – Sungai Petai, Alor Gajah, Melaka Store</strong></p><ul><li><p>Continued working on the Melaka store layout by adding more furniture and fixtures based on the initial zoning plan.</p></li><li><p>Referred to standard layout practices and previous project references for correct positioning and proportions.</p></li></ul><p><strong>Zoning Issue Identified and Redone</strong></p><ul><li><p>While placing the fixtures, noticed that the utility room area did not meet the required percentage based on company standards.</p></li><li><p>Due to this, the zoning had to be rearranged to increase the utility space without compromising other functional areas.</p></li><li><p>Adjusted zoning layout to balance all key sections such as display, cashier, toilet, and utility room.</p></li></ul><p><strong>Rearrangement of Fixtures</strong></p><ul><li><p>Updated furniture and fixture positions to match the revised zoning plan.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Saved the updated drawing and prepared for final detailing in the following session.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-13 00:05:38 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447254060</guid>
      </item>
      <item>
         <title>Day 3 (14/05/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447254288</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Final Checking – Sungai Petai, Alor Gajah, Melaka Store</strong></p><ul><li><p>Started the day by detailing and conducting a final review of the Melaka store layout.</p></li><li><p>Checked alignment, dimensions, zoning accuracy, and fixture placement to ensure compliance with company standards.</p></li></ul><p><strong>Drawing Presentation and Approval</strong></p><ul><li><p>Presented the finalized layout to the senior team for review.</p></li><li><p>Received approval after a brief discussion on zoning adjustments and fixture arrangement.</p></li></ul><p><strong>New Project – Kelantan Store</strong></p><ul><li><p>Began working on a new project for a store located in Kelantan.</p></li><li><p>Reviewed the architectural plan and previous layouts for reference.</p></li><li><p>Started setting up the AutoCAD file, including layers, title blocks, and scaled site layout based on provided documents.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Completed initial setup and prepared to begin zoning in the next session.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-13 00:05:50 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447254288</guid>
      </item>
      <item>
         <title>Day 4 (15/05/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447254479</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Zoning Setup – Panji, Kelantan Store</strong></p><ul><li><p>Started zoning the Kelantan store layout based on the architectural plan and project requirements.</p></li><li><p>Allocated key functional areas including display, cashier, utility, toilet, and circulation space.</p></li><li><p>Ensured proper proportion and flow between zones according to company layout guidelines.</p></li></ul><p><strong>Sungai Petai, Alor Gajah, Melaka Store – Empty &amp; Painting Layout</strong></p><ul><li><p>Worked on generating the empty layout and painting layout for the completed Melaka store project.</p></li><li><p>Followed company standards for layer setup, hatching, and annotation to clearly define painted areas and empty zones.</p></li></ul><p><strong>Furniture and Fixture Placement</strong></p><ul><li><p>Began placing standard furniture and fixtures within the zoned layout.</p></li><li><p>Referred to previous project layout and adjusted furniture placement to fit the new store’s dimensions and structure.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Saved ongoing work and prepared for review and refinement in the next session.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-13 00:05:59 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447254479</guid>
      </item>
      <item>
         <title>Day 5 (16/05/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447254616</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Power Up Breakfast Session</strong></p><ul><li><p>Attended the “Power Up Breakfast” and sharing session featuring Dato’ Chan Wah Kiang.</p></li><li><p>Gained valuable insight from the “No Excuse” topic, emphasizing responsibility, discipline, and a proactive work attitude.</p></li></ul><p><strong>Panji, Kelantan Store Layout Revision</strong></p><ul><li><p>Continued working on the Kelantan store drawing after the event.</p></li><li><p>Revised the layout based on feedback and suggestions received from the senior team.</p></li><li><p>Focused on improving zoning clarity and refining the furniture arrangement to enhance functionality and space flow.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Saved the revised layout and prepared for the next development phase in the coming week.</p></li></ul>]]></description>
         <enclosure url="https://padlet-uploads.storage.googleapis.com/2444312781/b4fddb7a5cef4b4969d1d956a801a469/image.png" />
         <pubDate>2025-05-13 00:06:07 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447254616</guid>
      </item>
      <item>
         <title>Day 1 (19/05/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447254733</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Panji, Kelantan Store Layout – Final Touch-Up and Submission</strong></p><ul><li><p>Continued working on the Kelantan store layout.</p></li><li><p>Finalized zoning adjustments and refined fixture and furniture placement to ensure accuracy and compliance with company standards.</p></li><li><p>Double-checked measurements, alignment, and overall drawing presentation.</p></li></ul><p><strong>Submission for Review</strong></p><ul><li><p>Submitted the completed Kelantan store drawing to the senior team for checking and feedback.</p></li><li><p>Awaited comments or revision instructions for further improvement.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Prepared for any adjustments following review and started organizing files for potential new tasks.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-13 00:06:12 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447254733</guid>
      </item>
      <item>
         <title>Day 2 (20/05/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447254962</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Review and Amendments – Panji, Kelantan Store</strong></p><ul><li><p>Received feedback on the Kelantan store drawing from the senior and supervisor.</p></li><li><p>Made amendments based on their comments, focusing on improving zoning distribution and adjusting several fixture placements to align with functional flow and updated requirements.</p></li></ul><p><strong>Project Team Meeting</strong></p><ul><li><p>Attended the weekly project team meeting with supervisors and colleagues.</p></li><li><p>Reviewed and rescheduled the upcoming project due dates based on the latest task list and priorities provided by the general manager.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Updated the Kelantan store drawing according to the new feedback and continued with layout refinement.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-13 00:06:24 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447254962</guid>
      </item>
      <item>
         <title>Day 3 (21/05/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447255094</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Amendments – Panji, Kelantan Store Layout</strong></p><ul><li><p>Continued making detailed amendments to the Kelantan store drawing based on the previous day’s feedback.</p></li><li><p>Refined zoning layout and adjusted furniture arrangements to improve space efficiency and functionality.</p></li></ul><p><strong>New Project Preparation – Taman Jasmin, Kajang Store</strong></p><ul><li><p>Started preparation for a new store project located in Kajang, Selangor.</p></li><li><p>Reviewed the site information and architectural plan provided.</p></li><li><p>Calculated the total land size as requested.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Finalized most of the Kelantan amendments and completed land area calculation for Kajang site setup.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-13 00:06:30 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447255094</guid>
      </item>
      <item>
         <title>Day 4 (22/05/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447255270</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Finalization – Panji, Kelantan Store Layout</strong></p><ul><li><p>Focused the day on finalizing the Kelantan store drawing.</p></li><li><p>Conducted thorough checks on zoning, fixture placement, and layout consistency.</p></li><li><p>Ensured all amendments were correctly implemented according to senior and supervisor feedback.</p></li><li><p>Reviewed layer arrangement, annotations, and drawing standards before marking the layout as completed.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Kelantan store layout finalized and submitted to senior and supervisor for review.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-13 00:06:38 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447255270</guid>
      </item>
      <item>
         <title>Day 5 (23/05/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447255362</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Listing Ceremony – EcoShop Marketing Berhad</strong></p><ul><li><p>Participated in the celebration of EcoShop Marketing Berhad’s listing ceremony in the morning.</p></li><li><p>Attended the event with the company team and observed the recognition and milestones shared by the management.</p></li></ul><p><strong>Panji, Kelantan Store – Minor Amendments</strong></p><ul><li><p>Made final minor adjustments to the Kelantan store layout based on additional feedback.</p></li><li><p>Ensured all details were consistent and polished for documentation and record purposes.</p></li></ul><p><strong>Taman Jasmin, Kajang Store – Setup Preparation</strong></p><ul><li><p>Continued setting up the base layout for the new Kajang, Selangor store.</p></li><li><p>Completed initial layer setup and began preparing the zoning area based on site measurements and architectural references.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Final tweaks done for Kelantan store; Kajang store drawing is in early setup stage, ready for development next week.</p></li></ul>]]></description>
         <enclosure url="https://padlet-uploads.storage.googleapis.com/2444312781/f27a62419c04adf05e2f12626dadb15c/image.png" />
         <pubDate>2025-05-13 00:06:43 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447255362</guid>
      </item>
      <item>
         <title>Day 1 (26/05/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447255534</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Taman Jasmin Kajang Store – Zoning Layout Development</strong></p><ul><li><p>Continued with the development of the Kajang store layout.</p></li><li><p>Focused on finalizing the zoning plan, allocating spaces for display, cashier, utility, toilet, and circulation areas.</p></li><li><p>Ensured zoning follows the company’s latest design guidelines and spatial efficiency standards.</p></li></ul><p><strong>Furniture and Fixture Preparation</strong></p><ul><li><p>Began placing furniture and fixtures into the zoned layout.</p></li><li><p>Referred to standard fixture blocks and adjusted placements according to the site scale and zoning arrangement.</p></li><li><p>Ensured functional flow and customer movement path were taken into consideration during the planning.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Zoning layout completed for Kajang store and furniture placement initiated for further detailing.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-13 00:06:52 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447255534</guid>
      </item>
      <item>
         <title>Day 2 (27/05/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447256019</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Taman Jasmin, Kajang Store – Finalization and Review</strong></p><ul><li><p>Finalized the zoning, furniture, and fixture layout for the Kajang store.</p></li><li><p>Conducted a detailed check on dimensions, layout consistency, and alignment with company standards.</p></li><li><p>Reviewed all layers, annotations, and drawing clarity to ensure it was ready for presentation.</p></li></ul><p><strong>Weekly Project Team Meeting</strong></p><ul><li><p>Attended the weekly project meeting in the afternoon.</p></li><li><p>Presented the finalized Kajang store layout to the team.</p></li><li><p>Received initial feedback from the supervisor and senior team, noted down possible amendments for implementation.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Kajang store drawing completed and reviewed during the team meeting; prepared for any required revisions.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-13 00:07:16 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447256019</guid>
      </item>
      <item>
         <title>Day 3 (28/05/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447256275</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Taman Jasmin, Kajang Store – Layout Amendments</strong></p><ul><li><p>Made necessary amendments to the Kajang store layout based on feedback received during the project team meeting.</p></li><li><p>Adjusted zoning proportions and repositioned selected fixtures for better spatial flow and compliance with updated requirements.</p></li></ul><p><strong>Kaki Bukit, Kangar Store – New Layout Setup</strong></p><ul><li><p>Started a new project for the Kangar store in Perlis.</p></li><li><p>Reviewed the site and architectural plans provided.</p></li><li><p>Set up the new AutoCAD drawing with appropriate layers, title blocks, and scaling.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Kajang layout amended as required; Kangar store drawing setup completed and ready for zoning work.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-13 00:07:30 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447256275</guid>
      </item>
      <item>
         <title>Day 4 (29/05/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447256505</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Presentation – Taman Jasmin, Kajang Store Layout</strong></p><ul><li><p>Presented the amended Kajang store layout to the senior and supervisor for further review.</p></li><li><p>Received constructive suggestions to improve the layout, focusing on enhancing customer flow, space utilization, and fixture placement.</p></li></ul><p><strong>Amendments Implementation</strong></p><ul><li><p>Revised the Kajang layout based on the suggestions provided.</p></li><li><p>Adjusted zoning areas and repositioned key fixtures to better match the intended design concept and operational needs.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Kajang store drawing updated with improvements after senior review; preparing for final checks.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-13 00:07:41 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447256505</guid>
      </item>
      <item>
         <title>Day 5 (30/05/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447256702</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Taman Jasmin, Kajang Store – Final Amendments and Presentation</strong></p><ul><li><p>Finalized the layout amendments for the Kajang store based on previous feedback.</p></li><li><p>Presented the revised version to the supervisor for final review and received approval for completion.</p></li></ul><p><strong>Quick Meeting – General Manager</strong></p><ul><li><p>Joined a short meeting with the General Manager and project team.</p></li><li><p>Discussed overall project progress and upcoming store targets.</p></li><li><p>The project timeline and store priorities were rescheduled based on updated planning and resource allocation.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Kajang store finalized and approved; project list and schedule updated after GM meeting.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-13 00:07:48 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447256702</guid>
      </item>
      <item>
         <title>Day 1 (02/06/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447256995</link>
         <description><![CDATA[<p><strong>Public Holiday – Agong’s Official Birthday</strong></p><ul><li><p>No work activities conducted in observance of the official birthday of</p></li></ul>]]></description>
         <enclosure url="https://padlet-uploads-usc1.storage.googleapis.com/2444312781/c5fa52a516da2f73a8b3972d0c309be1/image.png" />
         <pubDate>2025-05-13 00:08:03 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447256995</guid>
      </item>
      <item>
         <title>Day 2 (03/06/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447257354</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>New Project – Sungkai Store</strong></p><ul><li><p>Started working on the new Sungkai store project.</p></li><li><p>Prepared a new AutoCAD file and organized folders according to company standards.</p></li><li><p>Began drawing the existing layout based on provided site measurements and reference photos.</p></li></ul><p><strong>Weekly Department Meeting</strong></p><ul><li><p>Attended the department meeting in the afternoon with the project team and supervisor.</p></li><li><p>Shared updates on current progress and received overall direction for upcoming tasks and deadlines.</p></li><li><p>Discussed the new store planning and expectations for zoning and design approach.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Initial setup and base layout for Sungkai store completed. Ready to proceed with zoning and layout development.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-13 00:08:21 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447257354</guid>
      </item>
      <item>
         <title>Day 3 (04/06/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447257538</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Existing Layout Completion</strong></p><ul><li><p>Continued the Sungkai store project by completing the remaining parts of the existing layout in AutoCAD.</p></li><li><p>Rechecked dimensions and references to ensure alignment with the site measurements and photos.</p></li></ul><p><strong>Zoning Setup</strong></p><ul><li><p>Started the zoning process for the store layout.</p></li><li><p>Defined the main areas such as entrance, display zones, utility space, and storage based on standard planning guides and previous store references.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Completed existing layout and drafted zoning structure; ready for continue the furniture drawing.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-13 00:08:29 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447257538</guid>
      </item>
      <item>
         <title>Day 4 (05/06/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447257661</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Empty Layout Drawing</strong></p><ul><li><p>Proceeded with drafting the empty layout for the</p></li><li><p>Sungkai store based on the zoning planned on the previous day.</p></li><li><p>Referred to the zoning structure to guide the wall placements and spatial divisions.</p></li></ul><p><strong>Multiple Layout Options</strong></p><ul><li><p>Explored and developed three different layout options during the process.</p></li><li><p>Each option offered a slightly different spatial arrangement to optimize functionality and customer movement.</p></li><li><p>Compared the pros and cons of each version for further review.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Completed three empty layout options, pending feedback and selection for next stage of development.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-13 00:08:36 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447257661</guid>
      </item>
      <item>
         <title>Day 5 (06/06/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447257801</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Submission and Review – Sungkai Store Layout Options</strong></p><ul><li><p>Submitted the three drafted layout options for the Sungkai store to the team for review.</p></li><li><p>Discussed the advantages of each version and supported the decision-making process.</p></li></ul><p><strong>Presentation to Supervisor</strong></p><ul><li><p>Presented the selected layout option to the supervisor.</p></li><li><p>Received feedback for minor improvements before moving forward with furniture and fixture planning.</p></li></ul><p><strong>Sungai Perai, Alor Gajah, Melaka Layout Amendment</strong></p><ul><li><p>Amended the Melaka store layout due to a reduction in the total number of rented lots.</p></li><li><p>Adjusted the zoning and spatial arrangement to suit the smaller available area while retaining key functional zones.</p></li></ul><p><strong>Progress Update</strong><br>Final layout for Sungkai confirmed; revised Melaka layout completed based on new lot allocation.</p>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-13 00:08:41 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3447257801</guid>
      </item>
      <item>
         <title>Day 1 (09/06/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464283669</link>
         <description><![CDATA[<p><strong>Status: Emergency Leave</strong></p><p><strong>Remarks:</strong></p><ul><li><p>Unable to attend work due to LRT breakdown causing significant transport disruption.</p></li><li><p>Informed the supervisor and emergency leave was taken for the day.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-23 04:02:13 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464283669</guid>
      </item>
      <item>
         <title>Day 2 (10/06/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464283929</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Sungai Petai Store – Layout Amendment</strong></p><ul><li><p>Started the day by working on the Melaka Sungai Petai store layout.</p></li><li><p>Due to a reduction in the total number of rental lots, the entire layout needed to be rearranged and rezoned.</p></li><li><p>Reassessed the spatial allocation and adjusted all zones accordingly, including utility, display, and circulation areas.</p></li></ul><p><strong>Zoning Options Development</strong></p><ul><li><p>Prepared two revised zoning layout options to suit the new lot size and ensure optimal functionality.</p></li></ul><p><strong>Team Meeting Presentation</strong></p><ul><li><p>Presented the revised situation and shared the two zoning options for discussion and feedback.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Awaiting feedback and direction on which zoning option to proceed with.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-23 04:02:29 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464283929</guid>
      </item>
      <item>
         <title>Day 3 (11/06/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464284157</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Zoning Options Presentation – Sungai Petai Store</strong></p><ul><li><p>Finalized the two zoning layout options prepared the day before.</p></li><li><p>Each option addressed the reduced rental lot size with different spatial arrangements and display strategies.</p></li></ul><p><strong>Internal Discussion</strong></p><ul><li><p>Discussed the pros and cons of both options with the team to ensure clarity in function, flow, and feasibility.</p></li></ul><p><strong>Supervisor Presentation</strong></p><ul><li><p>Presented both layout options to the supervisor for review.</p></li><li><p>Provided explanation on zoning logic, circulation efficiency, and adaptability for store operation.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Currently awaiting feedback and final decision from the supervisor on the preferred option.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-23 04:02:41 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464284157</guid>
      </item>
      <item>
         <title>Day 4 (12/06/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464284345</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Supervisor Feedback – Sungai Petai Store</strong></p><ul><li><p>Received feedback from the supervisor regarding the two zoning options presented.</p></li><li><p>A preferred option was selected, and minor adjustments were suggested to improve circulation and space utilization.</p></li></ul><p><strong>Layout Progression</strong></p><ul><li><p>Continued the next phase of the Sungai Petai store layout by preparing the empty layout and painting layout based on the approved zoning.</p></li></ul><p><strong>New Project Kick-off – Jitra 2, Kedah</strong></p><ul><li><p>Started setting up the layout file for a new store project: Jitra 2, Kedah.</p></li><li><p>Prepared drawing references, checked the provided site plan, and organized files for layout development.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Melaka layout finalized and transitioned to new store project setup.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-23 04:02:50 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464284345</guid>
      </item>
      <item>
         <title>Day 5 (13/06/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464284499</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Jitra 2, Kedah Store – Existing Layout Drawing</strong></p><ul><li><p>Began drafting the existing layout based on the provided site measurements and reference photos.</p></li><li><p>Traced the building outline, marked key structural elements, and ensured dimensional accuracy using AutoCAD.</p></li></ul><p><strong>Zoning Setup</strong></p><ul><li><p>Started the initial zoning for the store layout.</p></li><li><p>Allocated spaces for key functions including display areas, utility rooms, office, and surau.</p></li><li><p>Ensured the zoning followed company design standards and functional flow.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Completed the existing layout and zoning draft, ready for review in the next stage.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-23 04:03:00 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464284499</guid>
      </item>
      <item>
         <title>Day 1 (16/06/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464286493</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Jitra 2, Kedah Store – Furniture and Fixture Layout</strong></p><ul><li><p>Continued working on the Jitra 2 store project.</p></li><li><p>Built and arranged all furniture and fixtures within the zoned layout using AutoCAD.</p></li><li><p>Prepared <strong>two layout options</strong> based on the zoning setup, each offering different circulation flows and space usage strategies.</p></li><li><p>Ensured accurate placement according to company standards for display, utility, office, and surau areas.</p></li><li><p>Reviewed dimensions and functional flow for feasibility and presentation.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Both options completed and ready for internal review.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-23 04:04:34 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464286493</guid>
      </item>
      <item>
         <title>Day 2 (17/06/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464286628</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Finalization – Jitra 2, Kedah Store</strong></p><ul><li><p>Conducted final checks on furniture placement, dimensions, and overall layout consistency.</p></li><li><p>Prepared the drawing for presentation and submission to supervisor.</p></li></ul><p><strong>Team Meeting</strong></p><ul><li><p>Attended the weekly project team meeting after lunch.</p></li><li><p>Presented 2 options for Jitra 2 layout and received feedback.</p></li><li><p>Discussed project progress, upcoming tasks, and layout direction for new projects.</p></li></ul><p><strong>New Task – Ikon Centrio Store</strong></p><ul><li><p>Assigned to work on the Ikon Centrio project.</p></li><li><p>Reviewed and refined the existing layout drawing based on the <strong>latest site measurement</strong> updates.</p></li><li><p>Adjusted structural elements and room boundaries to align with accurate dimensions.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Jitra 2 store layout finalized and submitted; Ikon Centrio store drawing updated and ready for next phase.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-23 04:04:42 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464286628</guid>
      </item>
      <item>
         <title>Day 3 (18/06/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464286810</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Jitra 2, Kedah Store – Final Presentation</strong></p><ul><li><p>Finalized the selected option for the Jitra 2 store layout.</p></li><li><p>Presented the completed layout to the manager for approval and further direction.</p></li><li><p>Received positive feedback with minor suggestions noted for future reference.</p></li></ul><p><strong>Ikon Centrio Store – Layout Arrangement</strong></p><ul><li><p>Continued working on the Ikon Centrio store layout.</p></li><li><p>Started arranging zoning areas and placing initial furniture and fixtures based on the updated structure.</p></li><li><p>Ensured alignment with design standards and proper space allocation for each functional area.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Jitra 2 store layout officially presented and closed; Ikon Centrio layout arrangement in progress.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-23 04:04:51 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464286810</guid>
      </item>
      <item>
         <title>Day 4 (19/06/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464287209</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Ikon Centrio Store – Layout Submission</strong></p><ul><li><p>Presented the completed and updated layout for the Ikon Centrio store to senior team members.</p></li><li><p>Received feedback and approval to proceed with documentation.</p></li></ul><p><strong>New Project – Taman Bunga Negara Store</strong></p><ul><li><p>Started the setup for a new store project at Taman Bunga Negara.</p></li><li><p>Created new drawing files and began reviewing the site information and measurements provided.</p></li><li><p>Outlined the initial structural plan in preparation for zoning and furniture placement.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Ikon Centrio layout submitted successfully; Taman Bunga Negara project setup initiated.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-23 04:05:01 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464287209</guid>
      </item>
      <item>
         <title>Day 5 (20/06/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464287414</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Taman Bunga Negara Store – Layout Progress</strong></p><ul><li><p>Continued working on the layout for the Taman Bunga Negara store.</p></li><li><p>Focused on zoning setup for display, utility, and office areas.</p></li><li><p>Began preliminary placement of furniture and fixtures based on site dimensions.</p></li></ul><p><strong>Ikon Centrio Store – Feedback &amp; Amendments</strong></p><ul><li><p>Received feedback from the senior team regarding the Ikon Centrio layout.</p></li><li><p>Made necessary amendments to zoning alignment and fixture arrangements as suggested.</p></li><li><p>Updated the drawing and resubmitted for further review.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Taman Bunga Negara layout development ongoing; Ikon Centrio layout amended as per feedback.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-23 04:05:11 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464287414</guid>
      </item>
      <item>
         <title>Day 1 (23/06/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464287615</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Taman Bunga Negara Store – Layout Development</strong></p><ul><li><p>Continued working on the layout for the Taman Bunga Negara store.</p></li><li><p>Focused on refining zoning and furniture arrangement to determine the best layout option.</p></li><li><p>Adjusted dimensions and spacing to improve flow and functionality of the store design.</p></li></ul><p><strong>Ikon Centrio Store – Final Amendments</strong></p><ul><li><p>Revisited the Ikon Centrio layout based on the latest feedback from the senior team.</p></li><li><p>Made final amendments to improve zoning clarity and fixture alignment.</p></li><li><p>Prepared the drawing for resubmission.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Taman Bunga Negara layout refinement ongoing; Ikon Centrio amendment completed and ready for review.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-23 04:05:23 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464287615</guid>
      </item>
      <item>
         <title>Day 2 (24/06/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464287885</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Finalization of Store Layouts</strong></p><ul><li><p>Finalized the layout for Taman Bunga Negara, including zoning, fixture, and furniture placement.</p></li><li><p>Reviewed and confirmed the final amendments for the Ikon Centrio store layout.</p></li><li><p>Ensured both drawings meet company standards and are ready for presentation.</p></li></ul><p><strong>Team Meeting</strong></p><ul><li><p>Attended the weekly department meeting with the supervisor and project team after lunch.</p></li><li><p>Presented the finalized layouts for Taman Bunga Negara and Ikon Centrio.</p></li><li><p>Received suggestions and feedback from the team for further improvement if necessary.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Both layouts presented and currently pending review or final confirmation based on feedback.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-23 04:05:39 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464287885</guid>
      </item>
      <item>
         <title>Day 3 (25/06/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464288035</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Taman Bunga Negara Store – Additional Option</strong></p><ul><li><p>Worked on an additional layout option for the Taman Bunga Negara store to provide more variety in planning.</p></li><li><p>Focused on optimizing zoning and fixture placement for improved store flow.</p></li></ul><p><strong>Ikon Centrio Store – Final Adjustment</strong></p><ul><li><p>Made slight revisions to the Ikon Centrio layout based on internal suggestions.</p></li><li><p>Completed and submitted the final version to the senior and manager for confirmation.</p></li></ul><p><strong>Kuala Sungai Baru Store – Site Condition Update</strong></p><ul><li><p>Received updated site condition information for the Kuala Sungai Baru store.</p></li><li><p>Reviewed changes and amended the existing layout accordingly to reflect accurate measurements and structural adjustments.</p></li></ul><p><strong>Panji Store – Fire System Feedback</strong></p><ul><li><p>Received feedback regarding fire system placement for the Panji store.</p></li><li><p>Updated the layout based on the fire safety requirements and ensured compliance with guidelines.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Multiple store layouts updated or finalized based on new input and feedback.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-23 04:05:49 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464288035</guid>
      </item>
      <item>
         <title>Day 4 (26/06/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464288211</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Submission of Completed Layouts</strong></p><ul><li><p>Submitted the updated layouts for Panji, Kuala Sungai Baru, and Ikon Centrio stores to the senior for further action and follow-up.</p></li><li><p>Ensured all changes were properly implemented and drawings were ready for the next process.</p></li></ul><p><strong>Taman Bunga Negara Store – Option Submission</strong></p><ul><li><p>Submitted two proposed layout options for the Taman Bunga Negara store to the manager.</p></li><li><p>Awaiting decision on the preferred plan to proceed with finalization.</p></li></ul><p><strong>New Store Assigned – Mirai Residence</strong></p><ul><li><p>Received a new project for the Mirai Residence store.</p></li><li><p>Initial documents and site information reviewed for preparation to begin layout work.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Multiple projects submitted for review and a new store project assigned for upcoming work.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-23 04:05:58 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464288211</guid>
      </item>
      <item>
         <title>Day 5 (27/06/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464288357</link>
         <description><![CDATA[<p><strong>Public Holiday – Awal Muharram (Islamic New Year)</strong></p><ul><li><p>No work activities were carried out.</p></li></ul><p><br></p>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-23 04:06:05 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464288357</guid>
      </item>
      <item>
         <title>Day 1 (30/06/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464288732</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Mirai Residence Store – Existing Layout Setup</strong></p><ul><li><p>Started work on the newly assigned Mirai Residence store project.</p></li><li><p>Created a new AutoCAD file and began plotting the existing layout using the provided site measurements and reference images.</p></li></ul><p><strong>Structural Beam Integration</strong></p><ul><li><p>Identified and plotted beam placements as part of the layout requirement.</p></li><li><p>Ensured accurate positioning to reflect on-site structural conditions and to support proper space planning.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Initial layout setup for Mirai Residence completed with focus on structural alignment.</p></li><li><p>Prepared for zoning and fixture planning in the next phase.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-23 04:06:27 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464288732</guid>
      </item>
      <item>
         <title>Day 2 (01/07/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464289045</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Zoning – Mirai Residence Store</strong></p><ul><li><p>Continued work on the Mirai Residence project.</p></li><li><p>Drafted the zoning layout based on existing structure, allocating appropriate areas for display, utility, and circulation flow.</p></li></ul><p><strong>Presentation Prep – Taman Bunga Negara Store</strong></p><ul><li><p>Reviewed and finalized layout drawings for Taman Bunga Negara store.</p></li><li><p>Prepared files and materials needed for presentation during the weekly department meeting.</p></li></ul><p><strong>Weekly Department Meeting</strong></p><ul><li><p>Presented Taman Bunga Negara layout to the project team.</p></li><li><p>Discussed feedback and updates on ongoing projects.</p></li><li><p>Received the latest list of upcoming store projects to be planned in the near future.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-23 04:06:47 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464289045</guid>
      </item>
      <item>
         <title>Day 3 (02/07/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464289141</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Zoning – Mirai Residence Store</strong></p><ul><li><p>Continued refining the zoning layout for Mirai Residence store.</p></li><li><p>Ensured functional space planning and flow within the layout.</p></li></ul><p><strong>Project Handover</strong></p><ul><li><p>Compiled and reviewed all work done for the Mirai Residence store.</p></li><li><p>Submitted completed zoning and layout files to the manager for review and further action.</p></li></ul><p><strong>New Project for Eco Shop</strong></p><ul><li><p>Initiated a new store project under the Eco Shop brand.</p></li><li><p>Started by reviewing initial requirements.</p></li><li><p>Began creating a new fixture by referencing available 3D visuals to align with the intended store concept.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Completed zoning and handover for the Mirai Residence store.</p></li><li><p>New fixture development for Eco Shop project is in early conceptual phase, pending further refinement.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-23 04:06:54 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464289141</guid>
      </item>
      <item>
         <title>Day 4 (03/07/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464289268</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>New Project Development – Eco Shop Store</strong></p><ul><li><p>Focused on developing fixture drawings for the new store project.</p></li><li><p>Created detailed layouts for new wall bay and gondola designs based on 3D visual references.</p></li><li><p>Ensured measurements and proportions followed company standards.</p></li></ul><p><strong>Furniture Replacement Task</strong></p><ul><li><p>Replaced the previous furniture layout in one of the existing store drawings with the newly designed fixtures.</p></li><li><p>Updated layout to reflect the latest design standard and maintained proper spacing and display orientation.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Completed draft designs for wall bay and gondola.</p></li><li><p>Updated existing store layout with newly designed furniture fixtures.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-23 04:07:02 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464289268</guid>
      </item>
      <item>
         <title>Day 5 (04/07/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464289363</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Jitra 2 Store Amendment</strong></p><ul><li><p>Reviewed the previous layout and applied amendments based on feedback received.</p></li><li><p>Adjusted zoning and fixture placements to improve space efficiency and compliance with current standards.</p></li></ul><p><strong>New Project Development – Eco Shop Store</strong></p><ul><li><p>Continued work on the new store project.</p></li><li><p>Focused on refining the fixture designs and organizing their placements in the layout.</p></li><li><p>Ensured consistency with the 3D visuals and internal guidelines.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Completed amendments for Jitra 2 store layout.</p></li><li><p>Advanced fixture arrangement and planning for the new Eco Shop store.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-05-23 04:07:08 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3464289363</guid>
      </item>
      <item>
         <title>Day 1 (07/07/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499813438</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Finalization – Jitra 2 Store Layout</strong></p><ul><li><p>Completed the final amendments and adjustments for the Jitra 2 store.</p></li><li><p>Ensured layout consistency with zoning, fixture placement, and company standards.</p></li></ul><p><strong>Final Touch – New Project (Eco Shop)</strong></p><ul><li><p>Refined the layout and fixture arrangements for the new project.</p></li><li><p>Checked alignment with 3D visual reference and internal design requirements.</p></li></ul><p><strong>New Store Setup – Taman Mengkuang Indah</strong></p><ul><li><p>Started setting up the drawing file and project folder for the new Taman Mengkuang Indah store.</p></li><li><p>Reviewed available site details and began preparing the base layout.</p></li></ul><p><strong>Presentation to Supervisor</strong></p><ul><li><p>Presented the finalized Jitra 2 and new project layouts to the supervisor for review and approval.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Jitra 2 and new project finalized; Taman Mengkuang Indah setup initiated.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 01:55:04 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499813438</guid>
      </item>
      <item>
         <title>Day 2 (08/07/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499814017</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Taman Mengkuang Indah – Layout Development</strong></p><ul><li><p>Continued working on the layout setup for the Taman Mengkuang Indah store.</p></li></ul><p><strong>Ikon Centrio – Amendments</strong></p><ul><li><p>Made slight revisions to the Ikon Centrio layout following senior feedback.</p></li><li><p>Updated fixture positioning and circulation flow as per suggestions.</p></li></ul><p><strong>Jitra 2 – Alternative Layout Options</strong></p><ul><li><p>Prepared two revised layout options for the Jitra 2 store, incorporating supervisor's comments from the previous review.</p></li><li><p>Focused on improving zoning clarity and customer movement flow.</p></li></ul><p><strong>Weekly Department Meeting</strong></p><ul><li><p>Attended the weekly meeting with the supervisor and project team.<br>Noted planning directions for upcoming stores.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Taman Mengkuang Indah layout development progressing, amendments for Ikon Centrio completed, and revised options for Jitra 2.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 01:55:26 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499814017</guid>
      </item>
      <item>
         <title>Day 3 (09/07/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499814569</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Taman Mengkuang Indah – Existing Layout Work</strong></p><ul><li><p>Continued developing the existing layout for the Taman Mengkuang Indah store.</p></li><li><p>Focused on accurate detailing of wall structures and referencing provided site measurements and photos.</p></li></ul><p><strong>Jitra 2 – Layout Amendments &amp; Presentation</strong></p><ul><li><p>Worked on further amendments for the Jitra 2 layout based on the latest feedback.</p></li><li><p>Refined zoning and adjusted fixture placements to improve store circulation and meet design intent.</p></li><li><p>Presented the updated layout to the supervisor for review and received final comments.</p></li></ul><p><strong>New Eco Project – Fixture Amendment &amp; Presentation</strong></p><ul><li><p>Made updates to the new Eco Shop project by modifying the previously created fixture designs.</p></li><li><p>Focused on ensuring visual consistency and practical integration with store layout.</p></li><li><p>Presented the progress to the supervisor, highlighting changes made and alignment with visual references.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Taman Mengkuang Indah layout in steady progress, Jitra 2 presented and updated, and Eco project fixture design reviewed by supervisor.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 01:55:49 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499814569</guid>
      </item>
      <item>
         <title>Day 4 (10/07/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499814796</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>New Eco Shop Project – Revisions</strong></p><ul><li><p>Focused on revising the new Eco Shop layout and fixture design based on the feedback received from the supervisor.</p></li><li><p>Adjusted gondola and wall bay placements to improve layout flow and display arrangements.</p></li></ul><p><strong>Taman Mengkuang Indah – Zoning and Fixture Placement</strong></p><ul><li><p>Continued working on Taman Mengkuang Indah store layout.</p></li><li><p>Progressed to zoning setup and began placing fixtures such as wall bays, gondolas, and utility spaces based on standard layout references.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Eco Shop revision nearing finalization. Taman Mengkuang Indah zoning and fixture placement progressing as planned.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 01:55:57 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499814796</guid>
      </item>
      <item>
         <title>Day 5 (11/07/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499814968</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Power-Up Breakfast Session</strong></p><ul><li><p>Attended the monthly Power-Up Breakfast session organized by the company.</p></li><li><p>Enjoyed the sharing and motivational segment, which helped start the day with positive energy.</p></li></ul><p><strong>Taman Mengkuang Indah – Fixture Layout &amp; Optioning</strong></p><ul><li><p>Continued working on the Taman Mengkuang Indah layout.</p></li><li><p>Placed fixtures and prepared layout options for internal review and planning.</p></li><li><p>Submitted the layout to senior for checking, received feedback, and proceeded to make necessary amendments.</p></li></ul><p><strong>New Eco Shop Project – Empty Layout</strong></p><ul><li><p>Started preparing the empty layout for the new Eco Shop project in parallel.</p></li><li><p>Ensured scaling and site references were in line with standard procedures.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Taman Mengkuang Indah layout revised based on feedback.<br>Eco Shop project setup phase completed, ready for zoning.</p></li></ul>]]></description>
         <enclosure url="https://padlet-uploads-usc1.storage.googleapis.com/2444312781/828460e5696ff7fd950804a8aa47ff02/image.png" />
         <pubDate>2025-06-24 01:56:04 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499814968</guid>
      </item>
      <item>
         <title>Day 1 (14/07/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499815556</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Taman Mengkuang Indah – Fixture &amp; Layout Refinement</strong></p><ul><li><p>Continued working on the layout for Taman Mengkuang Indah.</p></li><li><p>Refined fixture positioning and improved zoning flow based on earlier feedback.</p></li></ul><p><strong>Ikon Centrio – Design Amendment &amp; Approval</strong></p><ul><li><p>Received the latest company design updates and applied them to the Ikon Centrio layout.</p></li><li><p>Amended the layout according to the new standards and submitted it for review.</p></li><li><p>The revised Ikon Centrio layout was reviewed and approved by the senior team.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Taman Mengkuang Indah layout in final refinement stage.<br>Ikon Centrio layout finalized and approved.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 01:56:28 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499815556</guid>
      </item>
      <item>
         <title>Day 2 (15/07/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499815890</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Weekly Department Meeting (Morning)</strong></p><ul><li><p>Attended the weekly department meeting scheduled earlier in the day.</p></li><li><p>Presented the finalized layout for <strong>Taman Mengkuang Indah</strong>.</p></li><li><p>Received feedback from the team requiring revisions to the zoning and fixture placements.</p></li><li><p>Received the <strong>latest job list</strong> for upcoming projects and assignments.</p></li></ul><p><strong>Taman Mengkuang Indah – Revision Required</strong></p><ul><li><p>Noted required amendments to the layout based on feedback received during the meeting.</p></li><li><p>Prepared to revise zoning and recheck fixture arrangement.</p></li></ul><p><strong>New Eco Shop Project – Design Update</strong></p><ul><li><p>Received the latest information and design direction for the Eco Shop project.</p></li><li><p>Reviewed the updates and began planning the required amendments to align with the new concept.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Taman Mengkuang Indah finalized and presented during department meeting, revision needed based on feedback. </p></li><li><p>New Eco Shop project received updated info and amendment is in progress. </p></li><li><p>Latest task list received for upcoming projects.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 01:56:40 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499815890</guid>
      </item>
      <item>
         <title>Day 3 (16/07/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499816086</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Taman Mengkuang Indah – Emergency Staircase Amendment</strong></p><ul><li><p>Continued working on Taman Mengkuang Indah layout.</p></li><li><p>Adjusted the design to incorporate a newly requested emergency staircase as per the latest safety requirement.</p></li></ul><p><strong>Jitra 2 – Minor Layout Adjustment</strong></p><ul><li><p>Performed slight amendments on the Jitra 2 layout based on supervisor feedback.</p></li><li><p>Ensured alignment with the overall planning direction and updated the layout accordingly.</p></li></ul><p><strong>Eco Shop Project – Layout Discussion &amp; Refinement</strong></p><ul><li><p>Attended a design meeting with the General Manager and PIC to discuss the Eco Shop project's layout.</p></li><li><p>Received updated refinement points and layout adjustments based on current design strategy.</p></li></ul><p><strong>Post-Meeting Execution</strong></p><ul><li><p>Completed the required amendments for both Jitra 2 and Taman Mengkuang Indah.</p></li><li><p>Documented changes and saved files for further review and approval.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Jitra 2 finalized with minor tweaks. Taman Mengkuang Indah updated with emergency staircase. Attended meeting for Eco Shop layout refinement and received new layout directives.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 01:56:49 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499816086</guid>
      </item>
      <item>
         <title>Day 4 (17/07/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499816258</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Jitra 2 – Final Layout Submission</strong></p><ul><li><p>Completed the final version of the Jitra 2 layout.</p></li><li><p>Presented the layout to the manager for review.</p></li><li><p>Received minor feedback on layout adjustments and performed the necessary amendments.</p></li><li><p>Submitted the revised version for final confirmation.</p></li></ul><p><strong>Taman Mengkuang Indah – Layout Review and Amendments</strong></p><ul><li><p>Received feedback from both the senior and manager regarding the previously submitted layout.</p></li><li><p>Worked on refining the layout based on the comments provided.</p></li><li><p>Implemented necessary zoning and fixture adjustments to meet the revised requirements.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Jitra 2 finalized and submitted after minor tweaks. Taman Mengkuang Indah layout amended based on</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 01:56:58 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499816258</guid>
      </item>
      <item>
         <title>Day 5 (18/07/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499816451</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Taman Mengkuang Indah – Finalization</strong></p><ul><li><p>Focused on finalizing the Taman Mengkuang Indah layout.</p></li><li><p>Reviewed all previous amendments and ensured the latest feedback was properly implemented.</p></li><li><p>Double-checked fixture placements, zoning alignment, and updated drawing standards before preparing it for submission.</p></li></ul><p><strong>Document Compilation Support</strong></p><ul><li><p>Assisted the senior in compiling layout files and related documentation.</p></li><li><p>Helped organize the files and drawings listed by them into proper folders for internal reference and review purposes.</p></li></ul><p><strong>New Eco Shop Project – Refinement Work</strong></p><ul><li><p>Refined the New Eco Shop project layout based on feedback from Tuesday’s meeting.</p></li><li><p>Aligned the layout with updated display requirements and new zoning strategies.</p></li><li><p>Ensured the revisions matched the current project direction as discussed with management.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Taman Mengkuang Indah finalized. Helped compile required documents for senior. New Eco Shop project refined following Tuesday’s feedback.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 01:57:06 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499816451</guid>
      </item>
      <item>
         <title>Day 1 (21/07/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499816901</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Taman Mengkuang Indah – Final Feedback &amp; Amendment</strong></p><ul><li><p>Received final advice from senior regarding layout refinement.</p></li><li><p>Made necessary amendments according to the recommendations to improve circulation flow and compliance with updated internal standards.</p></li></ul><p><strong>Sungai Petai Store – Layout Revision</strong></p><ul><li><p>Received updated site information indicating the addition of one more shoplot to the existing plan.</p></li><li><p>Revised the entire layout to incorporate the new space, adjusting zoning, display areas, and pathways accordingly.</p></li></ul><p><strong>New Eco Shop Project – Final Submission &amp; Feedback</strong></p><ul><li><p>Finalized the layout based on previous refinement.</p></li><li><p>Submitted to supervisor for review and received minor feedback for amendment.</p></li><li><p>Made immediate adjustments to align with expected project direction.</p></li></ul><p><strong>Ikon Centrio – Site Condition Update Review</strong></p><ul><li><p>Received the latest site condition update for Ikon Centrio.</p></li><li><p>Began reviewing the current layout in relation to updated measurements and site constraints.</p></li><li><p>Prepared to make adjustments where necessary in upcoming tasks.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Taman Mengkuang Indah amended after senior’s feedback. Sungai Petai revised to include an additional shoplot. New Eco Shop finalized and submitted with minor adjustments. Ikon Centrio layout reviewed against latest site conditions.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 01:57:23 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499816901</guid>
      </item>
      <item>
         <title>Day 2 (22/07/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499817182</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>New Eco Shop Project – Minor Amendment</strong></p><ul><li><p>Made minor adjustments to the layout based on feedback received during the previous submission.</p></li><li><p>Refined fixture alignment and circulation to match updated project direction.</p></li></ul><p><strong>Ikon Centrio – Finalization &amp; Submission</strong></p><ul><li><p>Finalized the layout using the latest site measurements.</p></li><li><p>Reviewed all elements for accuracy and submitted the completed drawing to the senior for approval.</p></li></ul><p><strong>Sungai Petai &amp; Taman Mengkuang Indah – Final Prep for Presentation</strong></p><ul><li><p>Completed final touches and adjustments for both Sungai Petai and Taman Mengkuang Indah store layouts.</p></li><li><p>Ensured zoning, circulation, and annotations were clear and complete for team presentation.</p></li></ul><p><strong>Presentation Session – Layout Review</strong></p><ul><li><p>Presented all three finalized layouts:</p></li></ul><ol><li><p>Ikon Centrio</p></li><li><p>Sungai Petai </p></li><li><p>Taman Mengkuang Indah</p></li></ol><ul><li><p>Received detailed feedback on each from supervisor and team for further improvement and implementation.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Minor amendment completed for New Eco Shop. Ikon Centrio finalized and submitted. Sungai Petai and Taman Mengkuang Indah layouts finalized and presented. Feedback received for all three projects.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 01:57:34 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499817182</guid>
      </item>
      <item>
         <title>Day 3 (23/07/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499817419</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Ikon Centrio &amp; Taman Mengkuang Indah – Finalization &amp; Submission</strong></p><ul><li><p>Finalized layout revisions for both Ikon Centrio and Taman Mengkuang Indah.</p></li><li><p>Ensured all amendments based on previous feedback were addressed.</p></li><li><p>Submitted both layouts to the senior and manager for final approval.</p></li></ul><p><strong>Design Concept Meeting – Eco Shop Store</strong></p><ul><li><p>Attended a dedicated meeting introducing the new design concept for upcoming Eco Shop projects.</p></li><li><p>Gained insight into updated layout strategies, visual direction, and fixture planning.</p></li><li><p>Took notes for application in upcoming related tasks.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Finalized and submitted Ikon Centrio and Taman Mengkuang Indah layouts for approval. Attended Eco Shop design concept meeting to align with the new store design strategy.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 01:57:42 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499817419</guid>
      </item>
      <item>
         <title>Day 4 (24/07/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499817830</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Design Concept Meeting – New Direction for Future Eco Shop Stores</strong></p><ul><li><p>Attended a continuation meeting to discuss a new design direction for upcoming Eco Shop stores.</p></li><li><p>Explored updated visual strategy, spatial planning approach, and improved branding alignment.</p></li><li><p>Noted important design considerations shared by the designer for application in future store developments.</p></li></ul><p><strong>Sungai Petai Layout – Refinement &amp; Option Development</strong></p><ul><li><p>Refined the Sungai Petai layout based on feedback received during Tuesday’s project review.</p></li><li><p>Adjusted zoning, fixture placement, and circulation flow according to supervisor’s comments.</p></li><li><p>Developed multiple layout options to provide flexibility and clarity for the next round of review.</p></li></ul><p><strong>New Site Study – Jabi</strong></p><ul><li><p>Conducted an initial site study for the new Jabi project.</p></li><li><p>Reviewed available layout references and project brief to understand site context and requirements.</p></li><li><p>Prepared to begin preliminary planning based on the gathered information.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Attended design concept meeting for new Eco Shop direction; refined Sungai Petai layout based on Tuesday’s feedback; developed layout options for review; conducted site study for Jabi project.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 01:57:56 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499817830</guid>
      </item>
      <item>
         <title>Day 5 (25/07/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499818019</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Jabi Store – Site Study Continuation</strong></p><ul><li><p>Continued studying the Jabi store project based on initial documents and site information.</p></li><li><p>Reviewed layout references and requirements in preparation for upcoming layout development.</p></li><li><p>Began identifying key planning elements such as access points, zoning, and potential display areas.</p></li></ul><p><strong>CCTV Plan – Compilation Based on Senior’s Input</strong></p><ul><li><p>Compiled the necessary CCTV plan files as listed by the senior.</p></li><li><p>Organized all documents for submission purposes.</p></li><li><p>Ensured file naming and structure followed internal standards.</p></li></ul><p><strong>New Eco Shop Project – Hoarding Board Layout Preparation</strong></p><ul><li><p>Started working on the hoarding board layout for the confidential new Eco Shop project.</p></li><li><p>Referred to internal samples to align design with branding and content requirements.</p></li><li><p>Prepared initial layout setup for supervisor's review.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Reviewed site documents and continued Jabi project study; compiled CCTV plan based on senior’s list; started hoarding board layout for new Eco Shop; learned drawing methods from senior’s examples.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 01:58:05 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499818019</guid>
      </item>
      <item>
         <title>Day 1 (28/07/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499818531</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>New Eco Shop Project – Finalization &amp; Submission</strong></p><ul><li><p>Finalized the hoarding board layout for the confidential new Eco Shop project.</p></li><li><p>Reviewed all details to ensure accuracy and alignment with project requirements.</p></li><li><p>Submitted the finalized drawing to the manager for approval.</p></li></ul><p><strong>Sungai Petai Layout – Finalization &amp; Presentation</strong></p><ul><li><p>Finalized the Sungai Petai store layout based on prior feedback.</p></li><li><p>Ensured zoning, circulation, and annotations were complete and clear.</p></li><li><p>Presented the finalized layout to the manager for review and approval.</p></li></ul><p><strong>Ikon Centrio – Construction Drawing Amendment &amp; Learning Process</strong></p><ul><li><p>Amended the construction drawing for Ikon Centrio by referencing previous approved drawings.</p></li><li><p>Learned construction drawing standards, detailing, and technical annotations for the first time.</p></li><li><p>Applied corrections and adjustments as guided by senior references.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Finalized and submitted new Eco Shop project to manager; finalized and presented Sungai Petai layout to manager; amended Ikon Centrio construction drawing with guidance from previous drawings as first learning experience.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 01:58:25 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499818531</guid>
      </item>
      <item>
         <title>Day 2 (29/07/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499818729</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Ikon Centrio – Construction Drawing Completion &amp; Submission</strong></p><ul><li><p>Continued working on the construction drawing for Ikon Centrio.</p></li><li><p>Finalized detailing and annotations based on project requirements.</p></li><li><p>Submitted the completed drawing to the senior for checking.</p></li></ul><p><strong>Jabi Store – Existing Layout Development</strong></p><ul><li><p>Worked on the existing layout for the Jabi store.</p></li><li><p>Incorporated site information and references to create the base layout for further planning.</p></li></ul><p><strong>Department Meeting – Project Updates</strong></p><ul><li><p>Attended the scheduled department meeting.</p></li><li><p>Discussed ongoing projects, deadlines, and upcoming tasks.</p></li></ul><p><strong>Sungai Petai Layout – Presentation &amp; Approval</strong></p><ul><li><p>Presented the finalized Sungai Petai store layout to the department.</p></li><li><p>Received approval for the layout after review.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Continued and submitted Ikon Centrio construction drawing to senior; worked on Jabi existing layout; attended department meeting; presented Sungai Petai layout and obtained approval.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 01:58:32 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499818729</guid>
      </item>
      <item>
         <title>Day 3 (30/07/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499819008</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Town Hall Meeting – Company Updates</strong></p><ul><li><p>Attended the company town hall meeting.</p></li><li><p>Gained better understanding of the company’s operations, workflow, and interdepartment collaboration.</p></li><li><p>Learned about the company’s performance highlights, key objectives, and targets for FY26.</p></li><li><p>Noted department priorities and focus areas for upcoming projects.</p></li></ul><p><strong>New Eco Shop Project – Minor Amendment</strong></p><ul><li><p>Made slight amendments to the confidential new Eco Shop project layout.</p></li><li><p>Adjusted details to align with feedback before resubmission.</p></li></ul><p><strong>Jabi Store – Layout Zoning Development</strong></p><ul><li><p>Continued work on the Jabi store project.</p></li><li><p>Prepared an empty layout with zoning to define functional areas.</p></li><li><p>Submitted the zoning layout to the senior for review.</p></li></ul><p><strong>Gebeng Pahang Store – New Project Study</strong></p><ul><li><p>Received Gebeng Pahang as a new store project to work on.</p></li><li><p>Studied the new layout based on site measurements and site photos provided.</p></li><li><p>Noted key structural points and access areas for layout planning.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Attended town hall meeting; made minor amendment to new Eco Shop project; continued Jabi store by preparing and submitting zoning layout to senior; received and studied Gebeng Pahang store layout using site measurements and photos.</p></li></ul>]]></description>
         <enclosure url="https://padlet-uploads-usc1.storage.googleapis.com/2444312781/0cd9608a8aa7c51c810b578bb081a8ee/Screenshot_2025_07_30_162046.png" />
         <pubDate>2025-06-24 01:58:44 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499819008</guid>
      </item>
      <item>
         <title>Day 4 (31/07/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499819271</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Gebeng Pahang Store – Existing Layout &amp; Zoning</strong></p><ul><li><p>Continued working on the existing layout for the Gebeng Pahang store.</p></li><li><p>Reviewed site measurements and structure to refine the base plan.</p></li><li><p>Began zoning work for the layout to define functional areas and circulation.</p></li></ul><p><strong>New Eco Shop Project – Printing &amp; Presentation</strong></p><ul><li><p>Printed the finalized confidential new Eco Shop project layout.</p></li><li><p>Presented the printed layout to the manager for review and feedback.</p></li></ul><p><strong>Store Visit Preparation – Document Compilation</strong></p><ul><li><p>Studied details for two stores scheduled for site visits tomorrow.</p></li><li><p>Reviewed project information, store layouts, and key points to observe on-site.</p></li><li><p>Prepared and compiled all necessary documents required for the site visits.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Continued existing layout and zoning for Gebeng Pahang store; printed and presented new Eco Shop project to manager; prepared documents for tomorrow’s store visits.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 01:58:55 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499819271</guid>
      </item>
      <item>
         <title>Day 5 (01/08/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499819645</link>
         <description><![CDATA[<p><strong>Store Visit – Bukit Beruntung &amp; Tasik Permaisuri 2</strong></p><ul><li><p>Accompanied senior for site visits to Bukit Beruntung and Tasik Permaisuri 2 stores.</p></li><li><p>Purpose of visits:</p><ul><li><p>To understand how 2D drawings are translated into completed store setups.</p></li><li><p>To inspect defect works completed by contractors.</p></li></ul></li><li><p>Conducted defect checks at both stores.</p></li><li><p>Took photos of identified defects and recorded them for documentation.</p></li><li><p>This was my first actual store visit experience, providing valuable exposure to on-site implementation and real-world project assessment.</p></li></ul><p><strong>Gebeng Pahang Store – Existing Layout Continuation</strong></p><ul><li><p>Continued working on the existing layout for the Gebeng Pahang store.</p></li><li><p>Refined layout details using collected measurements and structural references.</p></li></ul><p><strong>Defect Work Presentation – Slide Preparation</strong></p><ul><li><p>Prepared presentation slides for defect work findings from the Bukit Beruntung and Tasik Permaisuri 2 visits.</p></li><li><p>Organized defect photos, notes, and descriptions for clear reporting.</p></li><li><p>Purpose of the defect presentation: To ensure all contractors are aware of their mistakes and align their work with the company’s design guidelines.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Completed site visits to Bukit Beruntung and Tasik Permaisuri 2 for defect checks and observation of completed store work; continued Gebeng Pahang existing layout; prepared defect work presentation slides to align contractors with design guidelines.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 01:59:09 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499819645</guid>
      </item>
      <item>
         <title>Day 1 (04/08/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499819997</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Defect Work Presentation – Slide Continuation</strong></p><ul><li><p>Continued preparing defect work presentation slides.</p></li><li><p>Organized photos, notes, and marked defects clearly for easy reference.</p></li><li><p>Ensured presentation content is clear for contractors to understand and align with design guidelines.</p></li></ul><p><strong>Updated Store List – Review</strong></p><ul><li><p>Received updated store list from supervisor.</p></li><li><p>Reviewed changes and noted newly added projects for upcoming tasks.</p></li></ul><p><strong>Taman Mastiara Store – New Project Setup</strong></p><ul><li><p>Received Taman Mastiara as a new store project.</p></li><li><p>Studied site information and measurements provided.</p></li><li><p>Opened new project file for Taman Mastiara to prepare for initial layout work.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Check-in completed; continued defect work presentation slides; reviewed updated store list; studied Taman Mastiara site information and opened new project file for layout preparation.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 01:59:22 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499819997</guid>
      </item>
      <item>
         <title>Day 2 (05/08/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499820266</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Taman Mastiara Store – Site Study Continuation</strong></p><ul><li><p>Continued studying site details for Taman Mastiara store.</p></li><li><p>Reviewed site measurements, photos, and structural constraints in preparation for layout plotting.</p></li></ul><p><strong>Weekly Department Meeting</strong></p><ul><li><p>Attended weekly department meeting at 9:00 AM.</p></li><li><p>Discussed ongoing projects and progress updates.</p></li><li><p>Received updated store list for upcoming tasks.</p></li></ul><p><strong>Taman Mastiara Store – Existing Layout Plotting</strong></p><ul><li><p>Began drawing the existing layout for Taman Mastiara store based on reviewed site information.</p></li><li><p>Ensured all dimensions and structural elements are accurately placed for reference in future zoning work.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Continued Taman Mastiara site study; attended department meeting and received updated store list; started plotting Taman Mastiara existing layout.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 01:59:32 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499820266</guid>
      </item>
      <item>
         <title>Day 3 (06/08/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499820607</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Taman Mastiara Store – Existing Layout Completion</strong></p><ul><li><p>Continued working on the existing layout for Taman Mastiara store.</p></li><li><p>Finalized placement of all structural details based on site measurements and references.</p></li></ul><p><strong>Taman Mastiara Store – Zoning &amp; Fixture Development</strong></p><ul><li><p>Started zoning process for Taman Mastiara store layout.</p></li><li><p>Planned fixture arrangement in accordance with circulation flow, product categories, and design guidelines.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Completed Taman Mastiara existing layout; began zoning and fixture planning for Taman Mastiara store.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 01:59:42 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499820607</guid>
      </item>
      <item>
         <title>Day 4 (07/08/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499820788</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Taman Mastiara Store – Zoning Refinement</strong></p><ul><li><p>Continued working on the Taman Mastiara store layout.</p></li><li><p>Placed customer staircase and cashier counter to ensure zoning logic and customer flow align with design intent.</p></li></ul><p><strong>Taman Mengkuang Indah – Layout Presentation &amp; Amendment</strong></p><ul><li><p>Presented Taman Mengkuang Indah layout to manager due to RGM’s request for an additional cashier counter.</p></li><li><p>Received minor feedback from the manager after presentation.</p></li><li><p>Amended layout accordingly and submitted the revised version to senior for review.</p></li></ul><p><strong>Kuala Sungai Baru – Bomba Amendment &amp; Learning</strong></p><ul><li><p>Amended Kuala Sungai Baru layout following the latest request from Bomba regarding safety compliance.</p></li><li><p>Learned specific Bomba requirements and regulations with guidance from senior.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Refined Taman Mastiara zoning and cashier placement; presented and amended Taman Mengkuang layout as per RGM and manager feedback; amended Kuala Sungai Baru layout based on Bomba request and learned related safety requirements.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 01:59:49 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499820788</guid>
      </item>
      <item>
         <title>Day 5 (08/08/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499821028</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Taman Mastiara Store – Fixture Placement &amp; Zoning Improvement</strong></p><ul><li><p>Continued work on the Taman Mastiara store layout.</p></li><li><p>Placed fixtures while considering the best possible option in terms of zoning, customer flow, and operational efficiency to ensure smooth circulation, minimal congestion, and ease of navigation for customers.</p></li></ul><p><strong>Mirai Residence – Layout Amendments</strong></p><ul><li><p>Amended painting layout according to updated requirements.</p></li><li><p>Made slight adjustments to furniture layout based on senior’s suggestion.</p></li></ul><p><strong>Store List Update – Upcoming Work</strong></p><ul><li><p>Received and reviewed updated store list from the department to plan for upcoming projects.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Continued Taman Mastiara fixture placement with focus on zoning, customer flow, and operational efficiency to improve circulation and reduce congestion; amended Mirai Residence painting layout and slightly revised furniture layout based on senior’s suggestion; updated store list for upcoming work.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 01:59:58 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499821028</guid>
      </item>
      <item>
         <title>Day 1 (11/08/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499821329</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Taman Mastiara Store – Fixture Layout &amp; Zoning</strong></p><ul><li><p>Continued working on Taman Mastiara store fixture layout.</p></li><li><p>Placed fixtures and planned zoning based on experience from previous store projects.</p></li><li><p>Finalized layout details and presented to senior for review.</p></li><li><p>Received feedback, made revisions accordingly, and prepared two fixture arrangement options for the supervisor to choose from.</p></li></ul><p><strong>New Eco Shop Project – Discussion</strong></p><ul><li><p>Discussed detailed design considerations and requirements of the New Eco Shop project with senior to ensure alignment before proceeding to the next stage.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Continued Taman Mastiara fixture layout with zoning informed by past store experience; finalized details, presented to senior, revised based on feedback, and prepared two fixture arrangement options for supervisor selection; discussed New Eco Shop project details with senior.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:00:10 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499821329</guid>
      </item>
      <item>
         <title>Day 2 (12/08/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499821557</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Taman Mastiara Store – Finalization</strong></p><ul><li><p>Finalized the Taman Mastiara store layout in preparation for the department meeting.</p></li><li><p>Ensured fixture placement, zoning, and circulation flow were optimized based on prior feedback and previous store experience.</p></li><li><p>Double-checked dimensions and arrangement to make sure all details were ready for review.</p></li></ul><p><strong>Taman Mastiara Store – Presentation</strong></p><ul><li><p>Presented both fixture arrangement options during the weekly department meeting.</p></li><li><p>Explained the reasoning behind each option in terms of customer flow, accessibility, and operational practicality.</p></li><li><p>Received constructive advice from the team, highlighting areas for improvement in zoning and fixture placement.</p></li></ul><p><strong>Upcoming Projects – Update</strong></p><ul><li><p>Received an updated list of upcoming store projects, noting deadlines and priority levels to prepare for future tasks.</p></li></ul><p><strong>Taman Mastiara Store – Amendment</strong></p><ul><li><p>Amended the zoning layout and relocated several fixtures based on meeting feedback.</p></li><li><p>Adjusted positioning to improve traffic flow and maintain consistency with company design guidelines.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Finalized Taman Mastiara layout for presentation; presented two fixture arrangement options and received improvement suggestions; amended zoning and fixture placement based on feedback; updated upcoming projects list.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:00:20 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499821557</guid>
      </item>
      <item>
         <title>Day 3 (13/08/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499821831</link>
         <description><![CDATA[<p><strong>Week 22 Day 3 – 13/08/2025 – Internship Logbook</strong></p><p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Taman Mastiara Store – Finalization &amp; Presentation</strong></p><ul><li><p>Finalized the Taman Mastiara store layout for presentation to the supervisor.</p></li><li><p>Presented the completed layout, explaining zoning, fixture arrangement, and customer flow considerations.</p></li><li><p>Received feedback on potential improvements to optimize circulation and fixture positioning.</p></li></ul><p><strong>Taman Mastiara Store – Amendment &amp; Option Development</strong></p><ul><li><p>Amended the layout based on supervisor feedback, adjusting zoning and fixture placement for better alignment with design standards.</p></li><li><p>Created two alternative layout options to provide flexibility for management’s decision-making.</p></li></ul><p><strong>Bandar Seri Alam, Masai Store – New Project Setup &amp; Site Study</strong></p><ul><li><p>Opened a new project file for the Bandar Seri Alam, Masai store.</p></li><li><p>Began initial preparation work, including reviewing site measurements, provided photos, and relevant project documents.</p></li><li><p>Conducted a site study to understand space conditions, potential challenges, and layout opportunities.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Finalized and presented Taman Mastiara layout to supervisor; amended design and prepared two layout options; initiated Bandar Seri Alam project setup and completed site study.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:00:30 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499821831</guid>
      </item>
      <item>
         <title>Day 4 (14/08/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499822031</link>
         <description><![CDATA[<p><strong>Medical Leave</strong></p><ul><li><p>Was unable to attend work due to health issues (food poisoning) that began on Day 3.</p></li><li><p>Took MC for the day to rest and recover.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>On medical leave, no work progress recorded.</p></li></ul>]]></description>
         <enclosure url="https://padlet-uploads-usc1.storage.googleapis.com/2444312781/910e3f87e6fdad736ab4232d4efbbadd/MC.jpeg" />
         <pubDate>2025-06-24 02:00:37 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499822031</guid>
      </item>
      <item>
         <title>Day 5 (15/08/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499822205</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Power-Up Breakfast – “Sehati Sejiwa Merdeka”</strong></p><ul><li><p>Attended the company’s Power-Up Breakfast session with the theme “Sehati Sejiwa Merdeka.”</p></li><li><p>Engaged in casual discussions with colleagues and enjoyed the team-bonding activity.</p></li></ul><p><strong>Taman Mastiara Store – Amendment &amp; Approval</strong></p><ul><li><p>Continued amendment work on the Taman Mastiara store layout based on previous feedback.</p></li><li><p>Presented the updated plan to the supervisor and received approval for the final version.</p></li></ul><p><strong>New Eco Shop Project – Specification Update</strong></p><ul><li><p>Amended the layout according to the most recent updated specifications.</p></li><li><p>Ensured changes aligned with the project’s updated requirements.</p></li></ul><p><strong>Bandar Seri Alam, Masai Store – Site Study</strong></p><ul><li><p>Continued studying the Bandar Seri Alam store using site measurements and photos provided.</p></li><li><p>Identified key zoning considerations for future layout work.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Attended Power-Up Breakfast (“Sehati Sejiwa Merdeka”); Taman Mastiara store amended and approved; New Eco Shop Project updated per latest specifications; Bandar Seri Alam Masai store study continued.</p></li></ul>]]></description>
         <enclosure url="https://padlet-uploads-usc1.storage.googleapis.com/2444312781/a7c18060dc716b9347a7fb03501e9a81/image.png" />
         <pubDate>2025-06-24 02:00:44 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499822205</guid>
      </item>
      <item>
         <title>Day 1 (18/08/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499822630</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Taman Mastiara Store – Amendment Based on OM Comment</strong></p><ul><li><p>Amended the Taman Mastiara store layout following OM’s feedback.</p></li><li><p>Relocated the customer toilet since the existing toilet on the 1st floor is usable, which helps reduce overall project cost.</p></li></ul><p><strong>Document Compilation</strong></p><ul><li><p>Organized and compiled all documents and drawings completed since the start of the internship.</p></li><li><p>Ensured files were properly labeled and easy to reference for future use.</p></li></ul><p><strong>Bandar Seri Alam, Masai Store – Existing Layout</strong></p><ul><li><p>Started preparing the existing layout for the Bandar Seri Alam, Masai store.</p></li><li><p>Plotted site details as the base reference for upcoming design work.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Amended Taman Mastiara layout based on OM’s cost-saving suggestion; internship documents compiled and organized; Bandar Seri Alam Masai existing layout initiated.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:00:59 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499822630</guid>
      </item>
      <item>
         <title>Day 2 (19/08/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499822888</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Taman Mastiara Store – Finalization</strong></p><ul><li><p>Finalized the Taman Mastiara store layout based on previous amendments and feedback.</p></li><li><p>Ensured zoning, fixture placement, and circulation flow were aligned before presentation.</p></li></ul><p><strong>Department Meeting</strong></p><ul><li><p>Attended the weekly department meeting.</p></li><li><p>Reviewed progress updates, upcoming project lists, and discussed design directions.</p></li></ul><p><strong>Taman Mengkuang Indah &amp; Kempadang Bay – Layout Updates</strong></p><ul><li><p>Updated both furniture layout and painting layout for Taman Mengkuang Indah and Kempadang Bay stores.</p></li><li><p>Adjusted plans to align with the latest design concept as directed by the team.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Taman Mastiara store finalized; attended department meeting; updated Taman Mengkuang Indah and Kempadang Bay layouts to match latest design concept.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:01:09 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499822888</guid>
      </item>
      <item>
         <title>Day 3 (20/08/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499823299</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Taman Mastiara Store – Amendment Work</strong></p><ul><li><p>Continued amendment on the Taman Mastiara store layout based on OM’s advice.</p></li><li><p>Worked on empty layout and painting adjustments to align with design direction.</p></li></ul><p><strong>New Eco Shop Project – Layout Update &amp; Finalization</strong></p><ul><li><p>Received the latest project information and amended the layout accordingly.</p></li><li><p>Presented the updated layout to the manager, received further advice, and applied final adjustments.</p></li><li><p>Finalized the revised layout and resubmitted to the team for record.</p></li><li><p>Prepared the finalized layout for documentation and project use.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Amended Taman Mastiara store based on OM’s advice; updated, presented, and finalized New Eco Shop project layout with the latest info.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:01:19 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499823299</guid>
      </item>
      <item>
         <title>Day 4 (21/08/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499823483</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Bandar Seri Alam Masai Store – Existing Layout</strong></p><ul><li><p>Continued to work on the existing layout preparation for the Bandar Seri Alam Masai store.</p></li><li><p>Ensured measurement details and site information were properly reflected in the layout file.</p></li></ul><p><strong>New Eco Shop Project – Layout Update &amp; Redo</strong></p><ul><li><p>Updated the New Eco Shop project layout based on PIC’s request.</p></li><li><p>Redid the full furniture layout and empty layout to align with the latest instructions.</p></li><li><p>Finalized the revised layout after completing the updates.</p></li><li><p>Presented the finalized layout to supervisor for review and confirmation.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Progressed on Bandar Seri Alam Masai existing layout; New Eco Shop project updated, redone, finalized, and presented for supervisor’s review.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:01:25 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499823483</guid>
      </item>
      <item>
         <title>Day 5 (22/08/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499823693</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Bandar Seri Alam Masai Store – Existing Layout &amp; Zoning</strong></p><ul><li><p>Continued to build the existing layout for Bandar Seri Alam Masai store.</p></li><li><p>Completed the existing layout preparation.</p></li><li><p>Proceeded with zoning work and started developing the empty layout to plan customer flow and fixture placement.</p></li></ul><p><strong>Taman Mastiara Store – Amendment &amp; Finalization</strong></p><ul><li><p>Amended the layout based on the latest advice received.</p></li><li><p>Finalized the revised layout to prepare for OM’s review.</p></li></ul><p><strong>Eco Snack Layout – Amendment &amp; Finalization</strong></p><ul><li><p>Amended the Eco Snack layout according to PIC’s feedback.</p></li><li><p>Finalized the updated layout and submitted it for supervisor review.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Bandar Seri Alam Masai existing layout completed and zoning work started; Taman Mastiara layout amended and finalized for OM review; Eco Snack layout amended, finalized, and submitted for supervisor review.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:01:32 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499823693</guid>
      </item>
      <item>
         <title>Day 1 (25/08/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499824023</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Internship Documentation – Early Submission</strong></p><ul><li><p>Submitted internship documents to obtain supervisor’s signature in advance, as supervisor will be on leave during the final week.</p></li></ul><p><strong>Bandar Seri Alam Masai Store – Furniture Layout</strong></p><ul><li><p>Continued working on the furniture plan for Bandar Seri Alam Masai store.</p></li><li><p>Submitted the layout to senior for review and received feedback.</p></li><li><p>Amended the layout based on the feedback provided.</p></li></ul><p><strong>New Eco Shop Project – Document Submission</strong></p><ul><li><p>Submitted project documents to supervisor as requested for record and review.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Internship documents submitted for advance signature; Bandar Seri Alam Masai furniture layout completed, reviewed, and amended; New Eco Shop project documents submitted to supervisor.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:01:46 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499824023</guid>
      </item>
      <item>
         <title>Day 2 (26/08/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499824533</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Bandar Seri Alam Masai Store – Finalization &amp; Presentation</strong></p><ul><li><p>Finalized the layout for Bandar Seri Alam Masai store.</p></li><li><p>Presented the finalized layout during the morning department meeting.</p></li><li><p>Learned that certain information had not yet been updated by the BD team, requiring the plan to be placed on hold until confirmation is received.</p></li></ul><p><strong>Kempadang Bay &amp; Taman Bunga Negara – Amendment</strong></p><ul><li><p>Made minor amendments to both Kempadang Bay and Taman Bunga Negara layouts.</p></li><li><p>Adjustments were done to align with the updated design concept.</p></li></ul><p><strong>Taman Mastiara Store – Demolition Plan</strong></p><ul><li><p>Updated the demolition plan for Taman Mastiara store to ensure compliance with project requirements.</p></li></ul><p><strong>Pengkalan Utama Station 18, Ipoh – New Site Study</strong></p><ul><li><p>Started site study for the new store project at Pengkalan Utama Station 18, Ipoh.</p></li><li><p>Reviewed available site details and prepared the groundwork for layout development.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Bandar Seri Alam Masai finalized and presented but placed on hold pending BD confirmation; Amendments completed for Kempadang Bay and Taman Bunga Negara; Taman Mastiara demolition plan updated; Began site study for Pengkalan Utama Station 18, Ipoh.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:01:55 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499824533</guid>
      </item>
      <item>
         <title>Day 3 (27/08/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499825135</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Pengkalan Utama Station 18, Ipoh – Existing Layout</strong></p><ul><li><p>Began work on the existing layout for Pengkalan Utama store.</p></li><li><p>Saved all site photos and organized them into a dedicated folder for systematic reference.</p></li><li><p>Carefully studied the site using both site photos and measurement documents to understand the shoplot’s physical conditions.</p></li><li><p>Plotted the existing layout, ensuring accuracy in wall dimensions, openings, staircase placement, and other critical site elements to form a reliable base drawing.</p></li></ul><p><strong>Pengkalan Utama Station 18, Ipoh – Zoning Study</strong></p><ul><li><p>After completing the existing layout, started analyzing the store space to figure out a suitable zoning arrangement.</p></li><li><p>Applied knowledge and experience gained from previous stores to test possible zoning strategies, such as customer circulation, main product areas, and cashier placement.</p></li></ul><p><strong>Taman Mastiara Store – Layout Update</strong></p><ul><li><p>Updated the Taman Mastiara layout to align with the actual site condition.</p></li><li><p>Discussed layout issues and possible adjustments with senior and QS, focusing on the practicality of certain fixture placements.</p></li><li><p>Revised codes for specific fixtures in the drawing based on the guidance received during the discussion.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Pengkalan Utama existing layout completed and zoning study initiated as preparation for detailed planning; Taman Mastiara layout amended to reflect site condition and fixture codes revised after consultation with senior and QS.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:02:06 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499825135</guid>
      </item>
      <item>
         <title>Day 4 (28/08/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499825351</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Pengkalan Utama Station 18, Ipoh – Zoning &amp; Fixture Placement</strong></p><ul><li><p>Focused fully on the Pengkalan Utama store throughout the day.</p></li><li><p>Continued from zoning study by refining circulation and functional zones within the store.</p></li><li><p>Began fixture placement to ensure an efficient layout that balances customer flow and operational needs.</p></li><li><p>Added a new emergency staircase in the plan since the first floor did not meet the required emergency runway standards. This adjustment was made to comply with safety regulations and ensure proper evacuation routes.</p></li></ul><p><strong>September Power-Up Breakfast – Event Preparation</strong></p><ul><li><p>Attended an internal discussion session for the upcoming September Power-Up Breakfast event.</p></li><li><p>Since this project is under our department’s responsibility as one of the PICs, the discussion involved cross-department coordination on planning the event flow.</p></li><li><p>Assigned the task of assisting in preparing the presentation slides (PPT) that will be used during the event. Took note of the event theme and requirements to ensure the slides align with the overall concept.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Pengkalan Utama zoning refined and fixture placement initiated with added emergency staircase to meet safety compliance; September Power-Up Breakfast discussion attended and assigned task to assist in preparing presentation slides for the event.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:02:11 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499825351</guid>
      </item>
      <item>
         <title>Day 5 (29/08/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499825761</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Pengkalan Utama Station 18, Ipoh – Layout Finalization &amp; Option Development</strong></p><ul><li><p>Continued working on the Pengkalan Utama store layout.</p></li><li><p>Finalized the layout prepared yesterday and presented it to senior for review and checking.</p></li><li><p>Received feedback from senior that additional layout options were required. Specifically, advised to prepare <strong>two layout options with different gondola arrangements</strong> to allow comparison and flexibility for decision-making.</p></li><li><p>Began amendment work by adjusting gondola placement, testing circulation flow, and maintaining zoning requirements while offering varied layout solutions.</p></li></ul><p><strong>Taman Mastiara Store – QS Requirement Amendment</strong></p><ul><li><p>Amended the Taman Mastiara layout to align with <strong>Quantity Surveyor (QS) requirements</strong>.</p></li><li><p>Focused on adjusting specific fixture codes and layout details to meet costing and compliance considerations raised during coordination with QS.</p></li><li><p>Ensured updated plan was consistent with previous zoning and circulation planning.</p></li></ul><p><strong>Progress Update</strong></p><ul><li><p>Pengkalan Utama layout finalized and presented; feedback received to provide 2 gondola arrangement options, amendment work in progress; Taman Mastiara layout amended to meet QS requirements.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:02:26 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499825761</guid>
      </item>
      <item>
         <title>Day 1 (01/09/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499826195</link>
         <description><![CDATA[<p><strong>Public Holiday – National Day (in lieu)</strong></p><ul><li><p>No work activities were carried out.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:02:42 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499826195</guid>
      </item>
      <item>
         <title>Day 2 (02/09/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499826408</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Pengkalan Utama Store – Layout Finalization &amp; Rework</strong></p><ul><li><p>Finalized the Pengkalan Utama store layout and presented it during the department meeting.</p></li><li><p>Received advice and feedback from the meeting which required reworking the layout.</p></li><li><p>Continued refining the design to better align with zoning and circulation requirements.</p></li></ul><p><strong>Defect Report Meeting – Review &amp; Analysis</strong></p><ul><li><p>Attended a department meeting focused on contractor defect reports.</p></li><li><p>Studied identified defects from the contractor’s work and noted areas where improvements can be made.</p></li><li><p>Understood how defect reporting helps ensure alignment with company standards and reduces future mistakes.</p></li></ul><p><strong>September Power-Up Breakfast – Preparation of PPT Slide</strong></p><ul><li><p>Assisted in preparation for the upcoming September Power-Up Breakfast event.</p></li><li><p>Created the PowerPoint slide deck for the event based on the set theme and previous event examples.</p></li><li><p>Coordinated with other departments to ensure the content was consistent with the event plan.</p></li></ul><p><strong>Pengkalan Utama Layout – Revision &amp; Senior Review</strong></p><ul><li><p>Reworked the Pengkalan Utama layout as per meeting feedback.</p></li><li><p>Made necessary adjustments and presented the revised layout to senior for review and further input.</p></li></ul><p><strong>Progress Update</strong><br>Pengkalan Utama layout finalized, presented, reworked, and submitted for senior review; attended defect report meeting to analyze contractor issues; prepared PPT slides for September Power-Up Breakfast.</p>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:02:50 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499826408</guid>
      </item>
      <item>
         <title>Day 3 (03/09/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499827122</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Pengkalan Utama Store – Finalization &amp; Submission</strong></p><ul><li><p>Finalized the amended layout and provided 3 options of furniture arrangement.</p></li><li><p>Presented the options to supervisor for decision-making.</p></li><li><p>After receiving feedback and management’s decision, finalized the layout.</p></li><li><p>Prepared the empty layout and painting layout, then submitted to senior for further action.</p></li></ul><p><strong>Bintagor, Sarawak – Site Study</strong></p><ul><li><p>Started studying the new site, Bintagor in Sarawak.</p></li><li><p>Reviewed the site layout based on information and details provided by the BD team.</p></li><li><p>Began drawing the existing layout to establish the base for further planning and development.</p></li></ul><p><strong>Progress Update</strong><br>Pengkalan Utama layout finalized with multiple options presented and approved; empty and painting layouts submitted to senior; new site study initiated for Bintagor, Sarawak.</p>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:03:10 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499827122</guid>
      </item>
      <item>
         <title>Day 4 (04/09/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499827576</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Bintagor, Sarawak – Existing Layout &amp; Discussion</strong></p><ul><li><p>Continued drawing the existing layout for Bintagor store.</p></li><li><p>Found the layout quite challenging for future furniture placement due to site conditions.</p></li><li><p>Finished the existing layout and asked opinion from senior on how the layout should be set for zoning and furniture placement.</p></li></ul><p><strong>September Power-Up Breakfast – Slide Amendment</strong></p><ul><li><p>Amended the presentation slides based on comments received.</p></li><li><p>Added new elements and refined the content to improve clarity and consistency.</p></li><li><p>Worked on fitting all slides within one cohesive theme, ensuring alignment in picture and font style.</p></li></ul><p><strong>Progress Update</strong><br>Completed Bintagor existing layout and discussed zoning/furniture direction with senior; amended Power-Up Breakfast slides with new elements and consistent theme.</p>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:03:25 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499827576</guid>
      </item>
      <item>
         <title>Day 5 (05/09/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499827754</link>
         <description><![CDATA[<p><strong>Public Holiday – Maulidur Rasul</strong></p><ul><li><p>No work activities were carried out.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:03:32 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499827754</guid>
      </item>
      <item>
         <title>Day 1 (08/09/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499828152</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Bintagor, Sarawak – Existing Layout, Zoning &amp; Empty Layout</strong></p><ul><li><p>Continued working on the existing layout for Bintagor store, ensuring the base plan was accurate with all site details properly reflected.</p></li><li><p>After completing the existing layout, proceeded with zoning and developing the empty layout, referring to last Thursday’s discussion with senior for guidance on flow and key area placement.</p></li><li><p>Worked on positioning critical elements such as cashier counters, staircase, utility area, and pump room within the layout.</p></li><li><p>Considered the customer circulation carefully to make sure shopping flow would be smooth and efficient, while also balancing operational requirements.</p></li><li><p>Faced challenges in arranging the zoning due to site constraints, but applied learnings from previous stores to propose a functional and practical layout.</p></li></ul><p><strong>September Power-Up Breakfast – Meeting &amp; Slide Update</strong></p><ul><li><p>Attended the Power-Up Breakfast meeting after lunch.</p></li><li><p>Shared and received suggestions on improving the slides.</p></li><li><p>Updated the slides based on discussion during the meeting, ensuring better alignment with the event plan.</p></li></ul><p><strong>Progress Update</strong><br>Bintagor existing layout completed with zoning and empty layout prepared; Power-Up Breakfast slides updated following meeting discussion.</p>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:03:47 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499828152</guid>
      </item>
      <item>
         <title>Day 2 (09/09/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499828398</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Bintagor, Sarawak – Empty Layout &amp; Zoning</strong></p><ul><li><p>Completed the empty layout and zoning work for Bintagor before the team meeting.</p></li><li><p>Focused on refining circulation flow and functional zoning to ensure smooth customer movement and store efficiency.</p></li><li><p>Adjusted the layout to balance both customer-facing areas and back-of-house requirements.</p></li></ul><p><strong>Team Meeting – Drawing Updates &amp; New Store List</strong></p><ul><li><p>Attended the team meeting to review the latest drawing updates and observe recent drawing presentations.</p></li><li><p>Gained insight into design approaches taken for different stores and how feedback from management was incorporated.</p></li><li><p>Received an updated list of new stores for upcoming tasks and learned that the Bintagor project would be temporarily put on hold due to certain site issues.</p></li></ul><p><strong>Rembau Store – Site Study &amp; Existing Layout</strong></p><ul><li><p>Requested and received site information for the new Rembau store from senior, including site measurements provided by the fit-out team.</p></li><li><p>Conducted a site study by reviewing the measurements and photos to understand space constraints and opportunities.</p></li><li><p>Started plotting the existing layout, ensuring accuracy in dimensions and structural details to prepare a solid base for upcoming zoning work.</p></li></ul><p><strong>Progress Update</strong><br>Bintagor empty layout and zoning completed; attended team meeting for drawing updates and received new store list; initiated site study and started existing layout for Rembau store.</p>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:03:55 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499828398</guid>
      </item>
      <item>
         <title>Day 3 (10/09/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499828656</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Rembau Store – Existing Layout &amp; Zoning</strong></p><ul><li><p>Continued drawing the existing layout for the Rembau store.</p></li><li><p>Carefully double-checked the layout against the site measurement to ensure accuracy in dimensions and positioning.</p></li><li><p>After completing the existing layout, proceeded to zoning work, planning how the store should function by referencing back to previous layouts for guidance.</p></li><li><p>Considered customer circulation, cashier placement, and operational flow during zoning to create a practical and efficient store plan.</p></li></ul><p><strong>September Power-Up Breakfast – Slide Refinement</strong></p><ul><li><p>Simultaneously refined the Power-Up Breakfast slides based on requests from the organizing team.</p></li><li><p>Updated the presentation with the latest content and information provided by other departments.</p></li><li><p>Focused on maintaining consistency in formatting, picture placement, and overall theme to align with the event’s visual direction.</p></li></ul><p><strong>Progress Update</strong><br>Rembau existing layout completed and zoning planned with reference to previous store layouts; Power-Up Breakfast slides refined and updated with inputs from other departments.</p>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:04:03 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499828656</guid>
      </item>
      <item>
         <title>Day 4 (11/09/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499828862</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>Rembau Store – Empty Layout &amp; Furniture Layout</strong></p><ul><li><p>Continued work on the Rembau store by proceeding with the empty layout after completing zoning in the previous session.</p></li><li><p>Developed the furniture layout and proposed 2 different options with varied fixture sizes.</p></li><li><p>Each option was planned to explore different types of customer flow and circulation patterns, aiming to identify the most efficient arrangement.</p></li><li><p>Both options were prepared for presentation to senior tomorrow, where feedback will determine which layout direction the company prefers to proceed with.</p></li></ul><p><strong>September Power-Up Breakfast – Final Meeting &amp; Preparation</strong></p><ul><li><p>Attended the final meeting for the September Power-Up Breakfast at 3:30 PM.</p></li><li><p>Coordinated with other team members to finalize arrangements and ensure all tasks were completed before the event.</p></li><li><p>Assisted in setting up the necessary materials and confirmed details for tomorrow morning’s event, ensuring readiness and smooth execution.</p></li></ul><p><strong>Progress Update</strong><br>Rembau empty layout completed and 2 furniture layout options prepared for presentation; attended final Power-Up Breakfast meeting and assisted with event preparations.</p>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:04:12 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499828862</guid>
      </item>
      <item>
         <title>Day 5 (12/09/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499828994</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to work and marked attendance.</p></li></ul><p><strong>September Power-Up Breakfast Event</strong></p><ul><li><p>Attended the September Power-Up Breakfast in the morning.</p></li><li><p>Participated in the event activities and enjoyed the prepared breakfast.</p></li><li><p>Observed how different departments collaborated to make the event successful, gaining exposure to cross-department teamwork.</p></li></ul><p><strong>Rembau Store – Presentation &amp; Refinement</strong></p><ul><li><p>Continued with the Rembau store task by presenting the proposed layouts to senior for review.</p></li><li><p>Received constructive feedback on both layout options, particularly on fixture placement and customer flow.</p></li><li><p>Refined the layouts accordingly to provide a better and more practical option for management’s decision-making.</p></li><li><p>Ensured the revised plans met both operational needs and design standards.</p></li></ul><p><strong>Company MV Shooting</strong></p><ul><li><p>Enrolled in the company MV (music video) shooting session together with department colleagues and staff from other departments.</p></li><li><p>Took part in the filming activities as part of the company-wide initiative, contributing to team spirit and company culture.</p></li></ul><p><strong>Progress Update</strong><br>Attended and participated in the September Power-Up Breakfast; presented Rembau store layouts to senior, refined them based on feedback to prepare improved options for management; joined company MV shooting with colleagues.</p>]]></description>
         <enclosure url="https://padlet-uploads-usc1.storage.googleapis.com/2444312781/c62aeca8b1f48c16ddd66075612f58e2/image.png" />
         <pubDate>2025-06-24 02:04:18 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499828994</guid>
      </item>
      <item>
         <title>Day 1 (15/09/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499829174</link>
         <description><![CDATA[<p><strong>Public Holiday – Additional Holiday for Malaysia Day</strong></p><ul><li><p>No work activities were carried out.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:04:25 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499829174</guid>
      </item>
      <item>
         <title>Day 2 (16/09/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499829506</link>
         <description><![CDATA[<p><strong>Public Holiday – Malaysia Day</strong></p><ul><li><p>No work activities were carried out.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:04:37 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499829506</guid>
      </item>
      <item>
         <title>Day 3 (17/09/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499829701</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to office and started the day’s task.</p></li></ul><p><strong>Rembau Store – Refinement &amp; Presentation</strong></p><ul><li><p>Began the day by refining all the Rembau store drawings, ensuring consistency and accuracy before presenting.</p></li><li><p>Prepared the finalized version of the layouts for presentation to the manager.</p></li><li><p>During the presentation session, received several amendment requests and detailed advice from the manager regarding zoning and fixture adjustments.</p></li><li><p>Immediately proceeded to amend the layout based on the manager’s explanations and recommendations to align with design expectations.</p></li></ul><p><strong>Jitra 2 Layout Update</strong></p><ul><li><p>Worked on the Jitra 2 store layout by updating it to match the latest design concept provided by the team.</p></li><li><p>Adjusted the furniture arrangement and painting layout to be consistent with current design standards.</p></li><li><p>Finalized the Jitra 2 layout and prepared it for submission and presentation to the manager for approval.</p></li></ul><p><strong>Metro Prima (Kepong) – New Site Study</strong></p><ul><li><p>Requested site measurement data, site photos, and additional information from senior staff for the new Metro Prima store in Kepong.</p></li><li><p>Reviewed and studied the available information to understand the site conditions before starting the drawing process.</p></li><li><p>Began preliminary planning and analysis for how the layout might be approached once the drawing work starts.</p></li></ul><p><strong>Progress Update</strong><br>Refined Rembau store drawings and presented to manager, made amendments based on feedback; updated Jitra 2 layout to align with latest design and finalized; started site study for Metro Prima (Kepong) with requested site info and initial analysis.</p>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:04:45 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499829701</guid>
      </item>
      <item>
         <title>Day 4 (18/09/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499829834</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to office and began the day’s tasks.</p></li></ul><p><strong>Metro Prima Store – Existing Layout</strong></p><ul><li><p>Started the day by working on the Metro Prima store, focusing on plotting the existing layout using the site info and measurement gathered earlier.</p></li><li><p>Ensured all walls, structural elements, and key site features were aligned properly to provide an accurate base for further planning.</p></li></ul><p><strong>Quick Team Meeting with General Manager</strong></p><ul><li><p>Attended a quick meeting with the General Manager together with the department team.</p></li><li><p>The session focused on handover of projects and updates on the new store list, which was shared with the senior for task allocation.</p></li></ul><p><strong>Presentation – Jitra 2 &amp; Rembau Layout</strong></p><ul><li><p>Prepared and presented both the Jitra 2 and Rembau layouts to the General Manager after the meeting.</p></li><li><p>Received direct advice for the Jitra 2 layout, with confirmation on areas that needed to be adjusted further.</p></li><li><p>For the Rembau store, approval was given to proceed as planned.</p></li><li><p>Forwarded all the necessary information and instructions to senior so that both projects could continue smoothly with the next steps.</p></li></ul><p><strong>Continuation – Metro Prima Store</strong></p><ul><li><p>Resumed work on Metro Prima after the presentation.</p></li><li><p>Continued refining the existing layout to make sure it was clean and ready for zoning and planning in the next stages.</p></li></ul><p><strong>Progress Update</strong><br>Worked on Metro Prima existing layout; attended quick meeting with GM for project handover and new store updates; presented Jitra 2 and Rembau layouts to GM, received feedback (amend Jitra 2, proceed with Rembau) and passed info to senior; continued developing Metro Prima existing drawing.</p>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:04:51 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499829834</guid>
      </item>
      <item>
         <title>Day 5 (19/09/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499830127</link>
         <description><![CDATA[<p><strong>Check-In</strong></p><ul><li><p>Reported to office and began the final day tasks.</p></li></ul><p><strong>Metro Prima Store – Zoning &amp; Empty Layout</strong></p><ul><li><p>Continued working on the Metro Prima store by setting up the zoning and preparing the empty layout.</p></li><li><p>Focused on completing the layout as much as possible to ensure it would be easier for my senior to continue after handover.</p></li><li><p>Made sure key elements such as customer flow and placement zones were properly marked for clarity.</p></li></ul><p><strong>Handover to Senior</strong></p><ul><li><p>Prepared the completed layouts for Metro Prima and officially handed them over to my senior.</p></li><li><p>Forwarded all the messages and updates I had received related to the project to ensure smooth continuation without missing details.</p></li></ul><p><strong>Exit Process</strong></p><ul><li><p>Completed the employee exit checklist as prepared by HR.</p></li><li><p>Returned all documents and company assets that were under my responsibility.</p></li><li><p>Finalized my internship duties and closed off pending matters in line with company procedures.</p></li></ul><p><strong>Progress Update</strong><br>Worked on zoning and empty layout for Metro Prima, completed layout as far as possible before handover, submitted layout and project updates to senior, and finalized internship exit process by completing HR checklist and returning all company documents/assets.</p><p><strong>Closing Reflection</strong><br>This internship has been a valuable learning journey where I gained hands-on experience in store layout planning, zoning, furniture arrangement, and coordination with different teams. Each project presented new challenges that allowed me to grow and improve my design and problem-solving skills. I am grateful for the support and guidance from my supervisor and colleagues, which helped me adapt and learn faster. Overall, this internship has strengthened my understanding of retail design and project workflow, and I truly appreciate the opportunity to contribute to the team.</p>]]></description>
         <enclosure url="" />
         <pubDate>2025-06-24 02:05:01 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3499830127</guid>
      </item>
      <item>
         <title>Day 1 (17/03/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3575560225</link>
         <description><![CDATA[<p><strong>Arrival and Check-In</strong></p><ul><li><p>Reported to the company and completed the check-in process.</p></li></ul><p><strong>Device Collection</strong></p><ul><li><p>Collected necessary tools and devices provided by the company.</p></li></ul><p><strong>Workstation Setup</strong></p><ul><li><p>Set up my workstation and ensured all equipment was ready for use.</p></li></ul><p><strong>Internship Briefing</strong></p><ul><li><p>Attended an orientation session conducted by the supervisor explaining company background, expectations, and rules.</p></li></ul><p><strong>Team Introduction</strong></p><ul><li><p>Meet with team members and learned about the project department structure.</p></li></ul>]]></description>
         <enclosure url="https://padlet-uploads-usc1.storage.googleapis.com/2444312781/605e68bcb10afacefe2d26d1a5591261/image.png" />
         <pubDate>2025-09-09 07:26:05 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3575560225</guid>
      </item>
      <item>
         <title>Day 3 (19/03/25)</title>
         <author>winson_chew_pooi</author>
         <link>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3575566577</link>
         <description><![CDATA[<p><strong>Review of Site Drawings</strong></p><ul><li><p>Studied the site drawings for a store layout project.</p></li><li><p>Identified key areas and dimensions to be included in the AutoCAD drawing.</p></li></ul><p><strong>AutoCAD Layout Drafting</strong></p><ul><li><p>Began drafting the store layout using AutoCAD based on the reviewed site drawings.</p></li><li><p>Focused on drawing walls, fixture locations, and store sections accurately.</p></li></ul><p><strong>Layout Review Session</strong></p><ul><li><p>Supervisor reviewed the initial draft and gave comments for improvement.</p></li><li><p>Noted areas to amend, such as scaling and spacing.</p></li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2025-09-09 07:29:48 UTC</pubDate>
         <guid>https://padlet.com/winson_chew_pooi/sv30ct0ii0gdo6fy/wish/3575566577</guid>
      </item>