<?xml version="1.0"?>
<rss version="2.0">
   <channel>
      <title>Personal project initiation - NZDB508E-19EX-M01-NX by TANZ eCampus</title>
      <link>https://padlet.com/itsupport4/oka6di60fhwg</link>
      <description></description>
      <language>en-us</language>
      <pubDate>2018-12-03 20:03:58 UTC</pubDate>
      <lastBuildDate>2019-02-04 09:49:34 UTC</lastBuildDate>
      <webMaster>hello@padlet.com</webMaster>
      <image>
         <url></url>
      </image>
      <item>
         <title>Deck and Roof</title>
         <author></author>
         <link>https://padlet.com/itsupport4/oka6di60fhwg/wish/327198972</link>
         <description><![CDATA[<div>Introduction: At my house there was a concrete porch that was too small to be useful and too hot in summer and too cold in winter.<br><br>Initiate:<br>Research into building code - documents available online.<br>Research construction regulations as well as materials for comparison. Determined methods to be used and the materials. <br>Set the parameters for the job based on height and area to be covered.<br>Draft a layout plan.<br>Calculate how many supports for the structure and the roofing methods.<br>Pricing of materials.<br>Pricing equipment.<br>Pricing labor.<br>Determine best time of the year to do this based on weather history.<br>Take leave from work to be available to do the work.<br><br><br>Planning:<br>1. The new deck covered area must be no more that 20 square meters, no more that 1 meter off the ground and not attached to the existing building to avoid the need for Counsel Consent. <br>2. All construction was to meet current building regulations methods.<br>3. Bill of materials<br>4. Ordered materials and supplies: Roof sheets, Piles, decking, battens, fasteners, nails, screws, concrete, spouting.<br>5. Hiring of tools such as boring tools.<br>6. Contracted the labor and arranged schedule of payment.<br>7. Bought tools needed.<br>8  Layout of new house piles and bored set in place, leveled square and laid the concrete.<br>9. Framing of deck and roof support.<br>10. laid decking complete<br>11. Laid roofing<br>12. installed spouting<br>13. Clean up area <br><br>Project monitoring:<br>Monitoring on cost and quality and availability of labor and equipment.<br>Essentially this meant splitting the project into 3 sections, to be completed in 3 steps as the cost was controlled to make used of seasonal supplier pricing specials.<br><br>Closure:<br>On completion, labor was paid, rental equipment returned. The waste materials were recycled and disposed of in the correct manner.<br>Feedback from all involved have identified changes and share learnings as well as future projects that will be tacked onto this small DIY project</div>]]></description>
         <enclosure url="" />
         <pubDate>2019-02-04 09:11:49 UTC</pubDate>
         <guid>https://padlet.com/itsupport4/oka6di60fhwg/wish/327198972</guid>
      </item>
   </channel>
</rss>
