<?xml version="1.0"?>
<rss version="2.0">
   <channel>
      <title>My supercalifragilisticexpialidocious padlet by Susana Assunção</title>
      <link>https://padlet.com/saccassuncao/l0cdoezcjph0</link>
      <description>Made with a dash of wit</description>
      <language>en-us</language>
      <pubDate>2016-10-30 18:04:04 UTC</pubDate>
      <lastBuildDate>2025-09-26 19:46:49 UTC</lastBuildDate>
      <webMaster>hello@padlet.com</webMaster>
      <image>
         <url></url>
      </image>
      <item>
         <title>The Bridge 25 th April</title>
         <author>saccassuncao</author>
         <link>https://padlet.com/saccassuncao/l0cdoezcjph0/wish/134096836</link>
         <description><![CDATA[<div>August 6th , 1966, a gigantic steel structure starts to connect the two banks of the Tagus - is the Salazar Bridge, named after the central figure of the New State.</div><div>When crossing between Lisbon and Almada was inaugurated, it was the fifth largest suspension bridge in the world and the largest outside the US, with a total length of 2280 meters, reaching the tray 70 meters from the water level.</div>]]></description>
         <enclosure url="https://padletuploads.blob.core.windows.net/aws/77576527/5da34ac981d5ee47a11c25d1c7b0dbae/Imagem_16309653_Fotos160_201x300.jpg" />
         <pubDate>2016-10-30 18:05:06 UTC</pubDate>
         <guid>https://padlet.com/saccassuncao/l0cdoezcjph0/wish/134096836</guid>
      </item>
      <item>
         <title>50 years later</title>
         <author>saccassuncao</author>
         <link>https://padlet.com/saccassuncao/l0cdoezcjph0/wish/134096940</link>
         <description><![CDATA[<div>The bridge was built with two lanes in each direction divided by a central reservation. Initially, the toll counted five cabins and the payment was made towards Lisbon and Almada. The first change had happened in 1990 with the opening of a fifth traffic lane, reversible, within the central reservation; three years later, the tolls were transferred to the Almada-Lisbon direction. In 1995 the works started over to extend the board with a sixth route, which will enter service in 1998, and the railroad, opened on 29 July 1999. Today´s the train carries 20 million passengers and 58 4 million vehicles pass the upper tray.</div>]]></description>
         <enclosure url="https://padletuploads.blob.core.windows.net/aws/77576527/a4fc7a1d6ded7e807d58bf30d9d31ec4/ponte25deabril3.jpg" />
         <pubDate>2016-10-30 18:06:47 UTC</pubDate>
         <guid>https://padlet.com/saccassuncao/l0cdoezcjph0/wish/134096940</guid>
      </item>
      <item>
         <title>Railway</title>
         <author>saccassuncao</author>
         <link>https://padlet.com/saccassuncao/l0cdoezcjph0/wish/134097078</link>
         <description><![CDATA[<div>Around 157 daily trains in both directions, carrying around eighty thousand passagersper day.</div>]]></description>
         <enclosure url="https://padletuploads.blob.core.windows.net/aws/77576527/8c4c3868320a05b03d9668b994ae97e6/railway.jpg" />
         <pubDate>2016-10-30 18:09:18 UTC</pubDate>
         <guid>https://padlet.com/saccassuncao/l0cdoezcjph0/wish/134097078</guid>
      </item>
   </channel>
</rss>
