      <item>
         <title>https://padlet.com/r_garvey/GPEQs</title>
         <author>r_garvey</author>
         <link>https://padlet.com/r_garvey/GPEQs/wish/294266442</link>
         <description><![CDATA[]]></description>
         <enclosure url="" />
         <pubDate>2018-10-18 10:51:32 UTC</pubDate>
         <guid>https://padlet.com/r_garvey/GPEQs/wish/294266442</guid>
      </item>
      <item>
         <title>Team 12 &amp; 15</title>
         <author></author>
         <link>https://padlet.com/r_garvey/GPEQs/wish/294266774</link>
         <description><![CDATA[<div>1) What project management services do GPE require?<br><br>2) How far progressed are GPE with this project?<br><br>3) when is the scheduled development due to complete<br><br>4) what are GPE requirements of the development<br><br>5) Would the space be for residential, commercial or retail use or a combination of these? – Based on the requirement for Sustainable Homes suggests that some of the development is for residential (although see further note on CfSH) <br><br>6) based on the time frame / programme, are you flexible on the procurement route i.e: </div><div>·       Design &amp; Build </div><div>·       Traditional <em>(first thought would be that this would be too short notice)</em> </div><div>·       Management Contracting <br><br><del>7) Have GPE obtained ground information from nearby developments which takes into account the history of the area (WWII &amp; industrial use) </del><br><br>8) What do GPE intend to do with the property after it has been developed?</div>]]></description>
         <enclosure url="" />
         <pubDate>2018-10-18 10:53:09 UTC</pubDate>
         <guid>https://padlet.com/r_garvey/GPEQs/wish/294266774</guid>
      </item>
      <item>
         <title>Team 8</title>
         <author></author>
         <link>https://padlet.com/r_garvey/GPEQs/wish/294266830</link>
         <description><![CDATA[<div>Budget?<br>Specification?<br>Finish date?<br>Building purpose?<br>Preferred procurement route?<br>Duration of project?<br>Building lifecycle?<br>Breeam requirements?<br>Reason for using RIBA stages?<br><br></div>]]></description>
         <enclosure url="" />
         <pubDate>2018-10-18 10:53:19 UTC</pubDate>
         <guid>https://padlet.com/r_garvey/GPEQs/wish/294266830</guid>
      </item>
      <item>
         <title>Team 16</title>
         <author>w1506685</author>
         <link>https://padlet.com/r_garvey/GPEQs/wish/294266887</link>
         <description><![CDATA[<div> </div><div>1.       How much to GPE have to spend on this entire project? </div><div>2.       Do GPE have a list of preferred contractors? </div><div>3.       How do GPE normally run their contracts? Single stage or 2 stage tender? </div><div>4.       Has a prior to commencement BREEAM assessment been carried out? </div><div>5.       Are you aware that Code of Sustainable Homes is no longer mandatory? (The standards can still be adhered to, however no certification will be provided.) </div><div>6.       Are GPE aiming for this scheme to solely be commercial / office space, or will an element of residential be considered? </div><div>7.       Has the project got planning permission? What level of planning? </div><div>8.       Have GPE already got proposed tenants to occupy this building? </div><div>9.       Is the scheme to be constructed to shell and core standard for tenants to fit out, or will contractor be employed to finish the scheme? </div><div>10.   Will the build need to satisfy specifications from tenants? </div><div>11.   The start date is noted as April 2019, what is this for, design work, construction etc.? <br>12. What services do GPE undertake in house?<br><br></div>]]></description>
         <enclosure url="" />
         <pubDate>2018-10-18 10:53:36 UTC</pubDate>
         <guid>https://padlet.com/r_garvey/GPEQs/wish/294266887</guid>
      </item>
      <item>
         <title>Team 1</title>
         <author>w1518994</author>
         <link>https://padlet.com/r_garvey/GPEQs/wish/294267188</link>
         <description><![CDATA[<div>1) What are the drivers for the desired start on site in April 2019, what are your aspirations for completion dates?<br><br></div><div><br></div><div>2) What was the decision making process in moving to the east end of London and away from your normal portfolio area of the West End?<br><br></div><div><br></div><div>3) What are the main risks and opportunities have you identified for this development?<br><br></div><div><br></div><div>4) From experience on previous successful projects, what elements of past project management strategies have you found to have worked well and not so well?<br><br></div><div><br></div><div>5) Why is achieving best practice in sustainability an important factor to you?<br><br></div><div><br></div>]]></description>
         <enclosure url="" />
         <pubDate>2018-10-18 10:54:58 UTC</pubDate>
         <guid>https://padlet.com/r_garvey/GPEQs/wish/294267188</guid>
      </item>
      <item>
         <title>Group 9</title>
         <author></author>
         <link>https://padlet.com/r_garvey/GPEQs/wish/294267342</link>
         <description><![CDATA[]]></description>
         <enclosure url="" />
         <pubDate>2018-10-18 10:55:39 UTC</pubDate>
         <guid>https://padlet.com/r_garvey/GPEQs/wish/294267342</guid>
      </item>
      <item>
         <title>Team 11</title>
         <author></author>
         <link>https://padlet.com/r_garvey/GPEQs/wish/294267723</link>
         <description><![CDATA[<div>1) What is the deadline for the project? Are there any key milestones, important dates, or time constraints?&nbsp;<br><br></div><div>2) Are there any potential roadblocks which may affect either the outcome or the timeframe for this project<br><br>3) What are the most important areas we should always focus on<br><br>4) What is the intended financial goal in the long term<br><br>5) The existing traditional façade which fronts directly onto Whitechapel high street, is this to remain as a conservation area or can it be refurbished?</div>]]></description>
         <enclosure url="" />
         <pubDate>2018-10-18 10:56:58 UTC</pubDate>
         <guid>https://padlet.com/r_garvey/GPEQs/wish/294267723</guid>
      </item>
      <item>
         <title>Team 7</title>
         <author></author>
         <link>https://padlet.com/r_garvey/GPEQs/wish/294267879</link>
         <description><![CDATA[<div>1) <strong>Is the project linked to the 2025 whitechapel Vision and what attribute are GPE looking to contribute towards?</strong> <br>2) <strong>Before the design stage commences, have you thought about any provisions to comply with section 106 of the town and country planning act 1990, depending on the type of use class?</strong> <br>3) <strong>Due to the renovation / fit out nature of the Cityside house project, would more focus on SKA accreditation be preferred to other sustainability schemes?<br>4) From the mention of the Code for Sustainable homes scheme within the brief, now that the scheme is no longer in use, would GPE still wish for the standards of the scheme to be met and achieved within the project?</strong>&nbsp; <br>5) <strong>By their own admission, GPE pride themselves on discovering ‘hidden potential’, with that in mind, is the construction of the Whitechapel Crossrail station (resulting in a potential regeneration of the area) the main influence on the decision to undertake a project in this vicinity, when the furthest east GPE have ventured is the City of London? (which has obvious benefits due to its location as a historic financial district)</strong> <br>6) <strong>What, if any, project management services will GPE provide or obtain from elsewhere (other than us), what services will you require of us?</strong> <br>7) <strong>Will this development be for existing shareholders and is the intention to let out or sell the building?</strong> <br>8) <strong>One of your main focuses is low rent and selling for reasonable prices, how do you plan on achieving this for this development?</strong> <br>9) <strong>With regards to programme, you have given a date of April 2019, is this to start building/fitting out or what is this to start? When do you want this development ready to use?</strong>&nbsp;</div>]]></description>
         <enclosure url="" />
         <pubDate>2018-10-18 10:57:35 UTC</pubDate>
         <guid>https://padlet.com/r_garvey/GPEQs/wish/294267879</guid>
      </item>
      <item>
         <title></title>
         <author></author>
         <link>https://padlet.com/r_garvey/GPEQs/wish/294268275</link>
         <description><![CDATA[<div>Team 13<br><br>1. Why is the location of this project different to your other projects?&nbsp;<br><br>2. What type of tenants will be occupying the building?<br><br>3. What services would you like us to provide and which services do your internal project management unit provide?</div>]]></description>
         <enclosure url="" />
         <pubDate>2018-10-18 10:59:06 UTC</pubDate>
         <guid>https://padlet.com/r_garvey/GPEQs/wish/294268275</guid>
      </item>
      <item>
         <title>Team 03</title>
         <author></author>
         <link>https://padlet.com/r_garvey/GPEQs/wish/294268411</link>
         <description><![CDATA[<div>&nbsp;</div><div>1.&nbsp; &nbsp; &nbsp;Why are they expanding in East London and why specifically Whitechapel?&nbsp;</div><div>2.&nbsp; &nbsp; &nbsp;What is the purpose of the project (Demolition, refurbishment)?&nbsp;</div><div>3.&nbsp; &nbsp; &nbsp;Has a site investigation been done due to the bombing on wwII?&nbsp;</div><div>4.&nbsp; &nbsp; &nbsp;What type of planning permission has been applied for?&nbsp;</div><div>5.&nbsp; &nbsp; &nbsp;When do the drawings be released?&nbsp;</div><div>6.&nbsp; &nbsp; &nbsp;Is the lift being put back in or they are putting a brand new lift?&nbsp;</div><div>7.&nbsp; &nbsp; &nbsp;Do they want to keep the same NIA?&nbsp;</div><div>8.&nbsp; &nbsp; &nbsp;What is the definition of prospective students&nbsp;</div><div>9.&nbsp; &nbsp; &nbsp;What is the wall section composed of?&nbsp;</div><div>10.&nbsp; What is the specific site works you want to start?&nbsp;</div><div>11.&nbsp; What PM services do they do in house?&nbsp;</div><div>12.&nbsp; Does the structure have to be RIBA or can we use something such as APM BOK to deliver the client needs?&nbsp;</div><div>13.&nbsp; Is there planning restrictions on planning?&nbsp;</div><div>14.&nbsp; Has any site investigation been conducted?&nbsp;</div><div>15.&nbsp; Underground have any bearing on what were doing??&nbsp;</div><div>16.&nbsp; What will the building be used for post-completion?&nbsp;</div><div>17.&nbsp; Party Wall agreement in place?&nbsp;</div><div>18.&nbsp; Is there a specific demographic for occupation?&nbsp;</div><div>19.&nbsp; What scheme? BREEAM or LEED?&nbsp;</div><div>20.&nbsp; On-site or off site recycling?&nbsp;</div>]]></description>
         <enclosure url="" />
         <pubDate>2018-10-18 10:59:32 UTC</pubDate>
         <guid>https://padlet.com/r_garvey/GPEQs/wish/294268411</guid>
      </item>
      <item>
         <title>Team 4</title>
         <author></author>
         <link>https://padlet.com/r_garvey/GPEQs/wish/294268461</link>
         <description><![CDATA[<div>Have you appointed any other consultants?&nbsp;<br>What in house services will you be using/ provide?&nbsp;<br>What is your current budget provisions?&nbsp;<br>What is your desired building outcome for use?&nbsp;<br>Code of sustainable homes is no longer recognised, would you still like to incorporate their standards?<br>Would you like the project to start or handover in April 2019?&nbsp;<br>Are there any specific contractors, consultants or the like you specifically want us to work with?&nbsp;<br>Do you have a preferred procurement route?&nbsp;<br>Do you have a list of Employers requirements, whether draft or standard form?&nbsp;<br>Do you have a preference between BREEAM / LEED / SKA or would you like to incorporate all?&nbsp;<br>Do you wish to use renewable energies?&nbsp;<br><br></div>]]></description>
         <enclosure url="" />
         <pubDate>2018-10-18 10:59:43 UTC</pubDate>
         <guid>https://padlet.com/r_garvey/GPEQs/wish/294268461</guid>
      </item>
      <item>
         <title>Team 10 </title>
         <author></author>
         <link>https://padlet.com/r_garvey/GPEQs/wish/294268767</link>
         <description><![CDATA[<div> </div><div>1.     What are the overall business goals that the project will achieve? <br><br></div><div>2.     What are the budgetary constraints within the project, and how are they split? <br><br></div><div>3.     How are you going to go about funding the project, and do we need to wait for funds before the project goes ahead? <br><br></div><div>4.     What is the overall proposal of the project? I.E would you like to retain the existing building, or demolish and re-build? Given that the property is not listed. <br><br></div><div>5.     When would you like the project to commence on site? <br><br></div><div>6.     Who has the ultimate responsibility for driving the project forward in terms of time frames and costs? <br><br></div><div>7.     As you are a profitable organisation, does this project have a percentage on return agreed? <br><br></div><div>8.     Are there any material specifications proposed to date? <br><br></div><div>9.     What will the buildings overall purpose be? <br><br></div><div>10. Do you have a deadline this project must be delivered by? <br><br></div><div>11. What is your driving factor? Cost, time or quality? And what can be compromised. <br><br></div><div>12. For any reason should the project not be met, I.E the U.K heads for recession, what would be the consequence of this not being met? (shareholders are affected etc?) <br><br></div><div>13. What is the reason for the location of the property being further away from London than any of your other projects? <br><br></div><div>14. How are you going to sustain overall financial viability from start to finish? <br><br></div><div>15. What types of IT design software will be used on the project, such as BIM? <br><br></div><div>16. Have all potential risks been identified? <br><br></div><div>17. What are the business goals that the project is aiming to achieve? <br><br></div><div>18. What business benefits will these goals deliver if achieved? <br><br></div><div>19. What will be the consequences to the business (financial, reputation etc) if the project does not go ahead or fails to deliver the objectives? <br><br></div><div>20. Are there any easy-to-implement alternatives to this project? Sometimes other solutions are available that do not require the cost implications of a full-blown project. <br><br></div><div>21. Are there any disadvantages to implementing this project <br><br></div><div>22. Who is the main stakeholder, with ultimate responsibility for driving the project forward? It is important that someone senior takes ownership of a project – that person should never be the project manager. <br><br></div><div>23. Who is responsible for ensuring appropriate resources (time, people and money) are allocated to the project? This should be someone with the authority to allocate whatever resources are required. <br><br></div><div>24. Who will be responsible for deciding whether the project goes ahead or not after the initial investigations? <br><br></div><div>25. Is the new project dependent on the successful delivery of a current project? If so, a full report on the status of the project already underway should be obtained before committing to the new project. <br><br></div><div>26. What are the success criteria that will indicate that the objectives have been met and the benefits delivered? <br><br></div><div>27. Will new equipment/products be required to facilitate project delivery for example is new software needed? <br><br></div><div>28. Will there be any necessary staff changes (redundancies or new hires)? <br><br></div><div>29. Will existing staff require re-training for example to learn new business processes? <br><br></div><div>30. Which individuals, teams or departments will be involved in the project? <br><br></div><div>31. Who will be responsible for documenting the business requirements in detail? <br><br></div><div>32. Who will determine interim and final deadlines? Projects where the marketing department, for example, decide on a deadline for an IT project have a far less chance of success than when informed estimates are made about the resources required. <br><br></div><div>33. How much contingency will be available in the budget? <br><br></div><div>34. Who will be responsible for making the decisions to include or exclude requested changes once the project is underway? <br><br></div><div>35. Will the project deliverables need to be tested and, if so, by whom? <br><br></div><div>36. Who will provide the final approval of the project deliverable? <br><br></div><div>37. Who is the client? This will determine what sort of project it will be from the outset <br><br></div><div>38. Who will be responsible for deciding if the project should go ahead following the initial investigations? <br><br></div><div>39. What are the budgetary constraints for the project? This will also help provide an indication as to the finish GPE are trying to achieve <br><br></div><div>40. Will there be a financial contingency in place for the project? Will there be an pot of additional funding should this be required <br><br></div><div>41. Is funding readily available for the project, or does current GPE projects need to be completed in order to release funds? Are the funds already in place to start the project or does ongoing projects need to be completed so that GPE have sufficient funds to begin <br><br></div><div>42. What is the intended purpose of the building and what are GPE setting out to achieve from the outset? Will it be an office, commercial space, retail etc. This will also be indicated from the first question as the client will determine what the building will be used for <br><br></div><div>43. What business goals will this achieve if the goals, and intended purpose, are met? <br><br></div><div>44. What are the consequences should the objectives not be met? Will this have a detrimental affect financially or will other factors be affected, such as reputation <br><br></div><div>45. What is the time frame for the project? As soon as possible is not really a sufficient answer <br><br></div><div>46. Does GPE have any material specifications? This may well depend on the intended purpose of the building <br><br></div><div>47. Who will be the main point of contact for the contract? This is vital as it will also be an indication as to who will be making the major decisions for the project <br><br></div><div>48. Have the necessary planning applications been submitted to the local authority? This is important prior to any works beginning. This will, again, help identify the main purpose of the intended building <br><br></div><div>49. Can the works be started prior to April 2019? <br><br></div><div>50. What is the deadline for the project? <br><br></div><div>51. Who is the contractor carrying out the works? <br><br></div><div>52. Will any new staff be required to facilitate the project? <br><br></div><div>53. Who will be responsible for allocating the appropriate staff to the project? <br><br></div><div>54. What are the disadvantages to carrying out the project? <br><br></div><div>55. Will any new software be required for the project? This could include software such as BIM <br><br></div><div>56. Will there be training provided should any new software/equipment be implemented? This coincides with the question above. Many people may not have used BIM so training may need to be provided to optimise the staff readily available <br><br></div><div>57. In order of priority (1 being most desired and 5 being least desired), please tell us what you would desire this project to be from the following: Minor Refurbishment, Major Refurbishment, New Build, Occupation and Sell, Other (Please elaborate) <br><br></div><div>58. In order of priority (1 being most desired and 5 being least desired),<br>please prioritise your client requirements that have been provided. <br><br></div><div>59. Please clarify what you mean by ‘start on site’ in April 2019? <br><br></div><div>60. Please clarify whether you wish to undertake design responsibility or<br>you wish this responsibility to be stepped down to a Main Contractor? <br><br></div><div>61. Please let us know whether you have party wall agreements for the East<br>and South elevations as we need to obtain those to ensure an optimal programme<br>is met. <br><br></div><div>62. Please clarify what environmental targets you will be hoping this project<br>achieves <br><br></div><div>63. Please inform us of your proposed NETT budget for this project? <br><br></div><div>64. If one is not in existence, have you managed to source a Project Team<br>including a PQS that can provide an Order of Cost Estimate? <br><br></div><div>65. Please inform us of your desired project completion date <br><br></div><div>66. Please inform us of any KPI’s that we or subsequent parties working for<br>you should adhere to <br><br></div><div>67. Do you wish for the lifts to be reinstated? <br><br></div><div>68. Do you have a conservation officer currently on board that we can liaise<br>with? <br><br></div><div>69. Do you have any particular requests (Employer’s Requirements) for this<br>development? i.e. details of the façade system etc <br><br></div><div>70. The ‘prospective tenants’ you refer to, who are they and what tenants<br>would you be targeting? <br><br></div><div>71. Assuming the project is in RIBA Stage 0, can all design details be<br>provided? <br><br></div><div>72. Has planning permission been obtained? <br><br></div><div>73. Has a planning application been put in yet? <br><br></div><div>74. Can we please have a project directory of all parties and individuals<br>involved with the project so far? <br><br></div><div>75. Do you possess details of the alterations and interventions that had<br>been carried out on this building in its entire history? <br><br></div><div>76. What return/profit are you looking to generate on this property and how<br>have you calculated this? <br><br></div><div>77. What resources/specialists does GPE has in house? <br><br></div><div>78. Can/will those resources be utilised in this project? <br><br></div><div>79. Is there a requirement to provide the commercial resources? <br><br></div><div>80. What is the budget? <br><br></div><div>81. What are the key dates for the project? <br><br></div><div>82. Who will be responsible for subcontract procurement? <br><br></div><div>83. Are there any specific/named suppliers or subcontractors that GPE would<br>like to use? <br><br></div><div>84. Is there a requirement to use document control system? <br><br></div><div>85. Is there a requirement to use a cloud platform for sharing documents<br>across parties? <br><br></div><div>86. What are the main constrains on the project? <br><br></div><div>87. Who is responsible for design? <br><br></div><div>88. Has design process already started? <br><br></div><div>89. Are there any additional utility connections required? <br><br></div><div>90.  </div><div>91.  </div><div> <br><br></div><div> <br><br></div><div> <br><br></div><div><br> <br> <br> <br><br></div>]]></description>
         <enclosure url="" />
         <pubDate>2018-10-18 11:01:05 UTC</pubDate>
         <guid>https://padlet.com/r_garvey/GPEQs/wish/294268767</guid>
      </item>
      <item>
         <title>Team 2</title>
         <author></author>
         <link>https://padlet.com/r_garvey/GPEQs/wish/294269000</link>
         <description><![CDATA[<div>Deadline for the project?<br>cost for the whole project?<br>preferred contractors?<br>management services to require?<br>long term financial goals?<br>main risks and opportunities from the potential development?<br>requirements for project<br>purpose of the project?</div>]]></description>
         <enclosure url="" />
         <pubDate>2018-10-18 11:02:11 UTC</pubDate>
         <guid>https://padlet.com/r_garvey/GPEQs/wish/294269000</guid>
      </item>
      <item>
         <title>Team 14</title>
         <author></author>
         <link>https://padlet.com/r_garvey/GPEQs/wish/294269015</link>
         <description><![CDATA[<ol><li>It has been noted that in the requirements you have asked for stages 1-6 of the RIBA plan of works, however is there a requirement to fulfil stage 0 of the RIBA plan of works and if so what is the scope for this element? </li><li>It has been noted that there is a requirement for sustainably standards such as BREEAM, LEED and SKA, which rating/scoring are you looking to achieve? Would you like to look at other standards such as WELL? </li><li>What is the driver for the April start on site date?</li><li>Have you got a completion date your working towards? </li><li>It has been noted that the site is situated in an area which has been heavily bombed in WW2, have any surveys been carried out and if so which have taken place? </li><li>It is noted that Liverpool street train station is in close proximity, what is our remit for engagement TFL and LUL? </li><li>Your business model is heavily located in central London, primarily in the West End, North of Oxford St. With this project based in East London, are you looking to establish a foothold in this area? </li><li>Is there a particular reason your first building in East London?</li><li>Have you engaged with any other consultants, if so who? </li><li>Have you had any engagement with the local authority?  </li><li><br></li></ol><div><br></div><div><br></div>]]></description>
         <enclosure url="" />
         <pubDate>2018-10-18 11:02:14 UTC</pubDate>
         <guid>https://padlet.com/r_garvey/GPEQs/wish/294269015</guid>
      </item>