      <title>Risk Management - Week 6 by </title>
      <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py</link>
      <description>Risk Management - Week 6</description>
      <language>en-us</language>
      <pubDate>2021-09-13 06:05:42 UTC</pubDate>
      <lastBuildDate>2021-09-19 11:22:16 UTC</lastBuildDate>
      <webMaster>hello@padlet.com</webMaster>
      <image>
         <url></url>
      </image>
      <item>
         <title>Discussion Questions</title>
         <author>negarhosseini</author>
         <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735200688</link>
         <description><![CDATA[<ul><li>What was the root cause of the disaster? (remember this may not be the event that caused it)</li><li>Thinking about the lifecycle of the project and the stakeholders involved - what contingencies could have been put in place?</li></ul><div><br></div>]]></description>
         <enclosure url="" />
         <pubDate>2021-09-13 06:34:09 UTC</pubDate>
         <guid>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735200688</guid>
      </item>
      <item>
         <title>Root cause</title>
         <author></author>
         <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735288816</link>
         <description><![CDATA[<div>Low quality of build material and structure - the base column cannot support weight of building itself.</div>]]></description>
         <enclosure url="" />
         <pubDate>2021-09-13 07:19:19 UTC</pubDate>
         <guid>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735288816</guid>
      </item>
      <item>
         <title>Root Cause</title>
         <author>hlia5773_2</author>
         <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735289719</link>
         <description><![CDATA[<div><strong>Architectural design issues:</strong><br><strong>1. The size of the pillar was reduced<br></strong>The construction company reduced the diameter of the pillars of the house from 80 cm to 60 cm, which reduced its support.<br><strong>2. Increased distance between steel bar and floor slab<br></strong>The distance between the steel bar and the top of the floor slab is increased from the original 5cm to 10cm, which reduces the bearing capacity of the floor slab.<br><br><strong>Violation management issues<br>3. Add floor<br></strong>The mall management wants to increase sales by adding more floors. The initial design of the building was 4 floors, but the management of the mall increased it to 5 floors and installed heavy heating equipment to increase the weight of the building.<br><strong>4. Fired the contractor<br></strong>Because the construction contractor refused to add floors, the manager fired them and replaced them with an in-house construction company.<br><br></div>]]></description>
         <enclosure url="" />
         <pubDate>2021-09-13 07:19:46 UTC</pubDate>
         <guid>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735289719</guid>
      </item>
      <item>
         <title>Root cause</title>
         <author>zuyang0205</author>
         <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735291732</link>
         <description><![CDATA[<div>1. The quality of building materials is low<br><br>2. Managers were not aware of the risks and did not anticipate the damage that embezzlement would bring to the project.<br><br>3. The original building plan was changed and one floor was added.<br><br>4. The original construction company was replaced because it recommended not to change the plan.<br><br></div>]]></description>
         <enclosure url="" />
         <pubDate>2021-09-13 07:20:47 UTC</pubDate>
         <guid>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735291732</guid>
      </item>
      <item>
         <title>The root cause of the disaster:</title>
         <author>hjia9633_2</author>
         <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735294283</link>
         <description><![CDATA[<div>1. The blueprint and purpose of the building were changed by the chairman of the Sanpoong Group, and many load-bearing columns were removed to install elevators.<br>2. The construction quality is not up to standard.<br>3. Improper building of floors on the building caused the building to be too heavy.<br>4. The lack of management of corruption within the government has led to supervision measures not being effectively implemented. Officials and groups collude to evade supervision, and no third party is monitoring their behavior, which means that the government lacks a complete governance system.<br>5. South Korea’s cultural background led to rapid construction while ignoring the quality of the building.</div>]]></description>
         <enclosure url="" />
         <pubDate>2021-09-13 07:21:57 UTC</pubDate>
         <guid>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735294283</guid>
      </item>
      <item>
         <title>Contingencies</title>
         <author>june0221r</author>
         <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735299906</link>
         <description><![CDATA[<div>1. Establish perfect supervisory measures and organize supervisory teams to monitor construction quality and material purchase<br><br>2. Leaving room for building development at the beginning of the design phase to lay the foundation for future expansion<br><br></div>]]></description>
         <enclosure url="" />
         <pubDate>2021-09-13 07:24:42 UTC</pubDate>
         <guid>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735299906</guid>
      </item>
      <item>
         <title>1. social</title>
         <author></author>
         <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735309288</link>
         <description><![CDATA[<ul><li>Corruption</li><li>Did not establish certain construction safety laws and regulations</li><li>Society is desperate to develop as rapidly as possible, a sensibility which renders the law nothing more than an obstacle to prosperity.</li><li>The prioritisation of size and quantity over safety and quality demanded by South Korea’s ideology of accelerated nation-building, expressed as a practice of accelerated city-building</li></ul><div><br></div>]]></description>
         <enclosure url="" />
         <pubDate>2021-09-13 07:28:49 UTC</pubDate>
         <guid>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735309288</guid>
      </item>
      <item>
         <title>2. Lee</title>
         <author></author>
         <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735312636</link>
         <description><![CDATA[<div>Corruption<br>Abuse of power<br>Ignorant and lacking the necessary expertise<br>No respect for engineering technology team</div>]]></description>
         <enclosure url="" />
         <pubDate>2021-09-13 07:30:27 UTC</pubDate>
         <guid>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735312636</guid>
      </item>
      <item>
         <title>3. Government</title>
         <author></author>
         <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735315035</link>
         <description><![CDATA[<ul><li>Corruption</li><li>Lack of supervision</li><li>Loss of legal authority</li><li>Did not establish certain construction safety laws and regulations</li></ul>]]></description>
         <enclosure url="" />
         <pubDate>2021-09-13 07:31:33 UTC</pubDate>
         <guid>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735315035</guid>
      </item>
      <item>
         <title>Contingencies</title>
         <author></author>
         <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735317253</link>
         <description><![CDATA[<div><strong>Planning stage</strong> - contingency reserve (schedule, resource)<br><strong>Executing stage</strong> - contingency &amp; management reserve (resource, vendor, technology, development)<br><strong>Delivery stage</strong> - contingency &amp; management reserve (contractual, vendor)<br><br></div>]]></description>
         <enclosure url="" />
         <pubDate>2021-09-13 07:32:41 UTC</pubDate>
         <guid>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735317253</guid>
      </item>
      <item>
         <title>4. No contingency plan</title>
         <author></author>
         <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735317297</link>
         <description><![CDATA[<div>No contingency plan of accident rescuing for hazard sources</div>]]></description>
         <enclosure url="" />
         <pubDate>2021-09-13 07:32:43 UTC</pubDate>
         <guid>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735317297</guid>
      </item>
      <item>
         <title>Main stakeholders:</title>
         <author>hjia9633_2</author>
         <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735318569</link>
         <description><![CDATA[<div>Group chairman, construction team, customers, government departments, employees of the Sampoong group, civil engineering experts, merchants</div>]]></description>
         <enclosure url="" />
         <pubDate>2021-09-13 07:33:28 UTC</pubDate>
         <guid>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735318569</guid>
      </item>
      <item>
         <title>Contingencies</title>
         <author>hjia9633_2</author>
         <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735326136</link>
         <description><![CDATA[<div>1. Perform an assessment before construction, estimate the upcoming emergency situation, and make a plan to reserve the time, resources and expenses needed to solve the problem.<br>2. Increase supervision during the construction process and introduce third-party agencies to strengthen the management of illegal operations.<br>3. Strictly check the construction team, and cannot use inadequately qualified builders, such as the actual construction team of the Sampoong Department Store.</div>]]></description>
         <enclosure url="" />
         <pubDate>2021-09-13 07:37:10 UTC</pubDate>
         <guid>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735326136</guid>
      </item>
      <item>
         <title>Root Cause Analysis</title>
         <author>tzha94301</author>
         <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735330037</link>
         <description><![CDATA[<div>I. The perfect location and the rapidly growing economy seduced the change of the construction plan from a residential one to a commercial building.<br><br>II. The change to the structure after construction start and increase in the building capacity; reduce the pillar size &amp; increase the steel bar &amp; floor slab distance.&nbsp;<br><br>III. The ignorance and underestimation of the project &amp; quality risk from top management.&nbsp;<br><br>IV.&nbsp; The ill-considered decisions of the Sampoong Department owner Lee Joon made the situation even worse. The contractor was fired for refusing to add the extra floor, etc.&nbsp;<br><br>V.&nbsp; The cultural background in the 70s &amp; 80s and the rapid enhancement of the urbanisation at S. Korea lay the foundation of the stimulated project management and the underestimate of the potential risks in execution. Plus, the corruption of the S.Korea Gov and the industry made the circumstance even worse.&nbsp;<br><br><br>&nbsp;</div>]]></description>
         <enclosure url="" />
         <pubDate>2021-09-13 07:38:47 UTC</pubDate>
         <guid>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735330037</guid>
      </item>
      <item>
         <title>Lifecycle Stakeholder</title>
         <author>tzha94301</author>
         <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735336294</link>
         <description><![CDATA[<div>I. Sampoong Group<br><br>II. Owner Lee Joon<br><br>III. Construction contractors<br><br>IV. Government &amp; Authorities<br><br>V. Local Community<br><br>VI. Business owners &amp; customers of the building<br><br></div>]]></description>
         <enclosure url="" />
         <pubDate>2021-09-13 07:41:44 UTC</pubDate>
         <guid>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735336294</guid>
      </item>
      <item>
         <title>Contingencies</title>
         <author>tzha94301</author>
         <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735341467</link>
         <description><![CDATA[<div>Technically:<br>* Professional design &amp; consulting<br>* Engineering &amp; Construction Supervision<br>* Sufficient Q&amp;A Control &amp; ITP system<br>* Permits and Approval System&nbsp;<br><br>Managerial:<br>*Board Management (Joint Project Leadership)<br>*Stakeholder-oriented management<br>*Engineering Specifications &amp; Success Criteria (Contractual Protected)<br>*Audit (Third-party / independent Audit) &amp; Anti-corruption<br>*Joint authorities in the construction industry<br>*Systematic Risk Management</div>]]></description>
         <enclosure url="" />
         <pubDate>2021-09-13 07:44:20 UTC</pubDate>
         <guid>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735341467</guid>
      </item>
      <item>
         <title>Contingencies</title>
         <author></author>
         <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735343925</link>
         <description><![CDATA[<div><strong>Concept Phase</strong>: The requirements and scope of the project need to set a baseline.<br><strong>Development Phase: </strong>The architectural design needs to ensure that the building can withstand additional loads.<br><strong>Implement Phase:</strong> The engineering team needs to supervise the construction team.<br><strong>Close Phase: </strong>Hiring and consulting a professional team for testing the maximum load capacity of the building.&nbsp;</div>]]></description>
         <enclosure url="" />
         <pubDate>2021-09-13 07:45:33 UTC</pubDate>
         <guid>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735343925</guid>
      </item>
      <item>
         <title>Question 2</title>
         <author></author>
         <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735349382</link>
         <description><![CDATA[<div><strong>Life cycle: <br>Establishment phase<br><br>Contingency:<br>- </strong>The government reviews building qualifications then the approval could be offered</div><div>- The contractor rejected the unreasonable demands</div><div>- Prepare the project safety planning before initiate design and construction</div><div>- Safety management measures</div><div>- Establish an emergency services department<br><br><strong>Stakeholder:</strong><br>Contractor</div><div>Sponsor</div><div>Government</div><div><br></div><div><br><br></div><div><br><br></div>]]></description>
         <enclosure url="" />
         <pubDate>2021-09-13 07:48:18 UTC</pubDate>
         <guid>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735349382</guid>
      </item>
      <item>
         <title>Question 2</title>
         <author></author>
         <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735356813</link>
         <description><![CDATA[<div><strong>Life cycle:</strong></div><div><strong>Execution phase</strong></div><div>&nbsp;</div><div><strong>Contingency:</strong></div><div>-Regular quality check and maintenance</div><div>-Safety facilities construction (including fire fighting facilities, safety zone, evacuation routes)</div><div>-Perform quality assurance to audit the quality requirements of the building during the construction phase&nbsp;</div><div>&nbsp;</div><div><strong>Stakeholder:</strong></div><div>Contractor</div><div>Government</div>]]></description>
         <enclosure url="" />
         <pubDate>2021-09-13 07:51:55 UTC</pubDate>
         <guid>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735356813</guid>
      </item>
      <item>
         <title>Question 2</title>
         <author>tili27381</author>
         <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735373000</link>
         <description><![CDATA[<div><strong>Life cycle:</strong><br>Completion phase <br><strong>Contingency:</strong><br>-Emergency evacuation and shelter</div><div>-Activate the alarm system to notify people to evacuate.</div><div>-Provision of emergency medical assistance</div><div>-Search and rescue and timely contact with outside help.</div><div>-Regular inspections are required after the completion of the building.</div><div><strong>Stakeholder:</strong><br>Customer</div><div>Staff</div><div>Senior management</div><div>Government</div>]]></description>
         <enclosure url="" />
         <pubDate>2021-09-13 07:59:18 UTC</pubDate>
         <guid>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735373000</guid>
      </item>
      <item>
         <title></title>
         <author></author>
         <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735486006</link>
         <description><![CDATA[<div>used fishbone to analyze and all posted on DB week 6</div>]]></description>
         <enclosure url="" />
         <pubDate>2021-09-13 08:57:00 UTC</pubDate>
         <guid>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735486006</guid>
      </item>
      <item>
         <title>Root Cause</title>
         <author>whua7877_2</author>
         <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735593932</link>
         <description><![CDATA[<div>1. After the war, South Korea's economy developed rapidly under the rule of dictators, and urbanization and commercial buildings also rose rapidly. Senior leaders and the government only focus on economic development and ignore quality and safety.<br><br>2. Change department store to Commercial store. The pillars of the original building did not meet the requirements of the commercial building and were the root cause of the collapse.<br><br>3. The substandard quality of building materials is one of the important reasons leading to the collapse of commercial buildings.<br><br>4. The direct cause of the installation of Air-conditioning machinery. Commercial buildings cannot bear the weight of air-conditioning machinery and cracks appear on the roof.<br><br>5. Ineffective management is the ultimate cause of tragic events. When the store cracked, the senior management did not take timely action to deal with it.</div>]]></description>
         <enclosure url="" />
         <pubDate>2021-09-13 09:59:06 UTC</pubDate>
         <guid>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735593932</guid>
      </item>
      <item>
         <title>Contingencies</title>
         <author>whua7877_2</author>
         <link>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735607138</link>
         <description><![CDATA[<div>1.In the early stage of construction, we should carefully review whether all indicators are up to standard<br><br>2.Develop effective measures<br>Strictly control the quality of materials and all aspects of construction<br><br>3. Hire a professional and experienced team<br><br>4. Troubleshoot issues regularly<br><br>5. Prepare enough savings</div>]]></description>
         <enclosure url="" />
         <pubDate>2021-09-13 10:07:39 UTC</pubDate>
         <guid>https://padlet.com/negarhosseini/h2m3orjl5o9k86py/wish/1735607138</guid>
      </item>