<?xml version="1.0"?>
<rss version="2.0">
   <channel>
      <title>SURVEYING IN CONSTRUCTION by Sr. AMS</title>
      <link>https://padlet.com/asmawan/gkojze7qralk</link>
      <description>Please organize all activities by the following categories:
1. Pre-Construction Stage
2. Construction Stage
3. Post-Construction Stage</description>
      <language>en-us</language>
      <pubDate>2018-04-15 23:54:14 UTC</pubDate>
      <lastBuildDate>2018-04-16 02:08:48 UTC</lastBuildDate>
      <webMaster>hello@padlet.com</webMaster>
      <image>
         <url></url>
      </image>
      <item>
         <title>SURVEYING IN CONSTRUCTION</title>
         <author>asmawan</author>
         <link>https://padlet.com/asmawan/gkojze7qralk/wish/251952926</link>
         <description><![CDATA[<div>Please organize all activities by the following categories:<br>1. Pre-Construction Stage - PRC<br>2. Construction Stage - C<br>3. Post-Construction Stage - POC<br><br>1.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;to fix the national and state boundaries; <strong>PRC</strong></div><div>2.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;to chart coastlines, navigable streams and lakes; <strong>PRC</strong></div><div>3.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;to establish <a href="https://nptel.ac.in/courses/105107122/modules/module1/htmlpage/4.htm">control points</a>; <strong>C</strong></div><div>4.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;to execute hydrographic and oceanographic charting and mapping; and <strong>PRC</strong></div><div>5.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;to prepare topographic map of land surface of the earth. <strong>PRC</strong></div><div>6.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;To produce up-to-date <a href="http://www.vermessungsseiten.de/englisch/vermtech/guide/glossary.htm#plan"><em>Engineering Plans</em></a> of the areas in which the work will be carried out. These plans form the basis for the design of the construction, and so the reliability of the design depends heavily on the attention to detail with which the survey is carried out. <strong>PRC</strong><br>7.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;To determine the required areas and volumes of land and materials needed during construction. <strong>C</strong></div><div>8.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;To ensure that the construction takes place in the correct realtive and absolute position on the ground. <strong>C</strong></div><div>9.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;To record the final position of the construction, including any design changes. <strong>POC</strong></div><div>10.&nbsp; &nbsp; &nbsp;To provide permanent control points from which particularly important projects can be surveyed - such as regular monitering a construction to check for movement. <strong>POC</strong></div><div>11.&nbsp; &nbsp; &nbsp;Survey existing conditions of the future work site, including topography, existing buildings and infrastructure, and underground infrastructure whenever possible (for example, measuring invert elevations and diameters of sewers at manholes); <strong>PRC</strong></div><div>12.&nbsp; &nbsp; &nbsp;Stake out lot corners, stake limit of work and stake location of construction trailer (clear of all excavation and construction) <strong>C</strong></div><div>13.&nbsp; &nbsp; &nbsp;Stake out reference points and markers that will guide the construction of new structures <strong>C</strong></div><div>14.&nbsp; &nbsp; &nbsp;Verify the location of structures during construction; <strong>C</strong></div><div>15.&nbsp; &nbsp; &nbsp;Provide horizontal control on multiple floors. <strong>C</strong><br>16.&nbsp; &nbsp; &nbsp;Conduct an As-Built survey: a survey conducted at the end of the construction project to verify that the work authorized was completed to the specifications set on plans.&nbsp; <strong>POC</strong></div>]]></description>
         <enclosure url="" />
         <pubDate>2018-04-15 23:57:15 UTC</pubDate>
         <guid>https://padlet.com/asmawan/gkojze7qralk/wish/251952926</guid>
      </item>
      <item>
         <title>GROUP 2 </title>
         <author></author>
         <link>https://padlet.com/asmawan/gkojze7qralk/wish/251963998</link>
         <description><![CDATA[]]></description>
         <enclosure url="" />
         <pubDate>2018-04-16 01:29:17 UTC</pubDate>
         <guid>https://padlet.com/asmawan/gkojze7qralk/wish/251963998</guid>
      </item>
      <item>
         <title>Group 1</title>
         <author></author>
         <link>https://padlet.com/asmawan/gkojze7qralk/wish/251965219</link>
         <description><![CDATA[<div>1 pre contraction ✓<br>2 pre construction ✓<br>3 Pre-construction X<br>4 Pre-construction ✓<br>5 - pre construction ✓<br>6 - pre construction ✓<br>7 - pre construction X<br>8 - construction ✓<br>9 post-construction ✓<br>10 pre-construction X<br>11 pre-construction ✓<br>12 pre-construction X<br>13 pre construction X<br>14 construction stage ✓<br>15 construction stage ✓<br>16 post-construction stage ✓</div>]]></description>
         <enclosure url="" />
         <pubDate>2018-04-16 01:36:42 UTC</pubDate>
         <guid>https://padlet.com/asmawan/gkojze7qralk/wish/251965219</guid>
      </item>
      <item>
         <title>Group 5 (Weapon Crush</title>
         <author></author>
         <link>https://padlet.com/asmawan/gkojze7qralk/wish/251966513</link>
         <description><![CDATA[<div>1. Pre-Construction stage ✔<br>2. Pre-Construction stage ✔<br>3. Pre-Construction stage <strong>X</strong><br>4. Pre-Construction stage ✔<br>5. Pre-Construction stage ✔<br>6. Pre-Construction stage ✔<br>7. Pre-construction stage <strong>X</strong><br>8. Construction stage ✔<br>9. Post-Construction stage ✔<br>10. Construction stage <strong>X</strong><br>11. Pre-Construction stage ✔ <br>12. Post-Construction stage <strong>X</strong><br>13. Pre-Construction stage <strong>X</strong><br>14. Construction stage ✔<br>15. Post-Construction stage <strong>X</strong><br>16. Post-Construction stage ✔</div>]]></description>
         <enclosure url="" />
         <pubDate>2018-04-16 01:44:49 UTC</pubDate>
         <guid>https://padlet.com/asmawan/gkojze7qralk/wish/251966513</guid>
      </item>
      <item>
         <title>GROUP 6 DOTS</title>
         <author></author>
         <link>https://padlet.com/asmawan/gkojze7qralk/wish/251966807</link>
         <description><![CDATA[<div>1. Pre-construction stage ✔️<br>2. Pre-construction stage✔️<br>3. Pre-construction stage✖️<br>4. Pre-construction stage✔️<br>5. Pre-construction stage✔️<br>6. Pre-construction stage✔️<br>7. Pre-construction stage✖️<br>8. Construction stage✔️<br>9. Post-construction stage✔️<br>10. Pre-construction stage✖️<br>11. Pre-construction stage✔️<br>12. Construction stage✔️<br>13. Pre-construction stage✖️<br>14. Pre-construction stage✖️<br>15. Pre-construction stage✖️<br>16. Post-construction stage✔️</div>]]></description>
         <enclosure url="" />
         <pubDate>2018-04-16 01:46:34 UTC</pubDate>
         <guid>https://padlet.com/asmawan/gkojze7qralk/wish/251966807</guid>
      </item>
      <item>
         <title>group 7</title>
         <author></author>
         <link>https://padlet.com/asmawan/gkojze7qralk/wish/251967153</link>
         <description><![CDATA[<div><br>Please organize all activities by the following categories:<br>1. Pre-Construction Stage<br>2. Construction Stage<br>3. Post-Construction Stage<br><br>1.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;to fix the national and state boundaries;(PRE-CONSTRUCTION)(/)<br>2.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;to chart coastlines, navigable streams and lakes;(PRE CONSTRUCTION)<br>3.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;to establish control points;(PRE-CONSTRUCTION) (X)<br>4.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;to execute hydrographic and oceanographic charting and mapping; and(PRE CONSTRUCTION)(/)<br>5.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;to prepare topographic map of land surface of the earth. (PRE-CONSTRUCTION)(/)<br>6.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;To produce up-to-date Engineering Plans of the areas in which the work will be carried out. These plans form the basis for the design of the construction, and so the reliability of the design depends heavily on the attention to detail with which the survey is carried out. (CONSTRUCTION STAGE)(X)<br>7.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;To determine the required areas and volumes of land and materials needed during construction.(PRE-CONSTRUCTION)(X)<br>8.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;To ensure that the construction takes place in the correct realtive and absolute position on the ground.(CONSTRUCTION PHASE)(/)<br>9.&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;To record the final position of the construction, including any design changes.(POST CONSTRUCTION)(/)<br>10.&nbsp; &nbsp; &nbsp;To provide permanent control points from which particularly important projects can be surveyed - such as regular monitering a construction to check for movement.(CONSTRUCTION STAGE)(X)<br>11.&nbsp; &nbsp; &nbsp;Survey existing conditions of the future work site, including topography, existing buildings and infrastructure, and underground infrastructure whenever possible (for example, measuring invert elevations and diameters of sewers at manholes);(PRE CONSTRUCTION)(/)<br>12.&nbsp; &nbsp; &nbsp;Stake out lot corners, stake limit of work and stake location of construction trailer (clear of all excavation and construction) (PRE CONSTRUCTION)(X)<br>13.&nbsp; &nbsp; &nbsp;Stake out reference points and markers that will guide the construction of new structures (PRE CONSTRUCTION)(X)<br>14.&nbsp; &nbsp; &nbsp;Verify the location of structures during construction;( CONSTRUCTION PHASE)(/)<br>15.&nbsp; &nbsp; &nbsp;Provide horizontal control on multiple floors. (PRE CONSTRUCTION)(X)<br>16.&nbsp; &nbsp; &nbsp;Conduct an As-Built survey: a survey conducted at the end of the construction project to verify that the work authorized was completed to the specifications set on plans. (POST&nbsp; CONSTRUCTION)(/)<br><br><br>9/16 . #KitaOk<br><br><br></div>]]></description>
         <enclosure url="" />
         <pubDate>2018-04-16 01:49:30 UTC</pubDate>
         <guid>https://padlet.com/asmawan/gkojze7qralk/wish/251967153</guid>
      </item>
      <item>
         <title>Group 3: Landmarkers</title>
         <author></author>
         <link>https://padlet.com/asmawan/gkojze7qralk/wish/251967973</link>
         <description><![CDATA[<div><strong>Pre-Construction Stage</strong></div><div>1. To fix the national and state boundaries</div><div>2. To chart coastlines, navigable streams and lakes</div><div>4. To execute hydrographic and oceanographic charting and mapping</div><div>5. To prepare topographic map of land surface of the earth.</div><div>6. To produce up-to-date Engineering Plans of the areas in which the work will be carried out. These plans form the basis for the design of the construction, and so the reliability of the design depends heavily on the attention to detail with which the survey is carried out.</div><div>7. To determine the required areas and volumes of land and materials needed during construction.</div><div>11. Survey existing conditions of the future work site, including topography, existing buildings and infrastructure, and underground infrastructure whenever possible (for example, measuring invert elevations and diameters of sewers at manholes)</div><div>13. Stake out reference points and markers that will guide the construction of new structures</div><div><br></div><div><br></div><div><strong>Construction Stage</strong></div><div>10. To provide permanent control points from which particularly important projects can be surveyed - such as regular monitering a construction to check for movement.</div><div>12. Stake out lot corners, stake limit of work and stake location of construction trailer (clear of all excavation and construction)</div><div>14. Verify the location of structures during construction;</div><div>15. Provide horizontal control on multiple floors.</div><div><br></div><div><strong>Post-Construction Stage<br></strong>3. To establish control points</div><div>8. To ensure that the construction takes place in the correct realtive and absolute position on the ground.<br>9. To record the final position of the construction, including any design changes.</div><div>16. Conduct an As-Built survey: a survey conducted at the end of the construction project to verify that the work authorized was completed to the specifications set on plans</div>]]></description>
         <enclosure url="" />
         <pubDate>2018-04-16 01:54:56 UTC</pubDate>
         <guid>https://padlet.com/asmawan/gkojze7qralk/wish/251967973</guid>
      </item>
      <item>
         <title>GROUP 2 </title>
         <author></author>
         <link>https://padlet.com/asmawan/gkojze7qralk/wish/251968012</link>
         <description><![CDATA[<div>SURVEYING IN CONSTRUCTION<br><br>Please organize all activities by the following categories:<br>1. Pre-Construction Stage<br>2. Construction Stage<br>3. Post-Construction Stage<br><br>1. to fix the national and state boundaries; <strong><em>(construction stage)</em></strong><strong><br></strong><br>2. to chart coastlines, navigable streams and lakes;<strong><em> (pre-construction)</em></strong><br><br>3. to establish control points; (<strong><em>Pre-construction stage)<br></em></strong><br>4. to execute hydrographic and oceanographic charting and mapping; and <strong><em>(Pre-construction stage)<br></em></strong><br>5. to prepare topographic map of land surface of the earth. <strong><em>(pre-construction stage)<br></em></strong><br>6. To produce up-to-date Engineering Plans of the areas in which the work will be carried out. These plans form the basis for the design of the construction, and so the reliability of the design depends heavily on the attention to detail with which the survey is carried out. <strong><em>(pre-construction stage)<br></em></strong><br>7. to determine the required areas and volumes of land and materials needed during construction. <strong><em>(construction stage)</em></strong><br><br>8. to ensure that the construction takes place in the correct realtive and absolute position on the ground. <strong><em>(construction stage)</em></strong><br><br>9. To record the final position of the construction, including any design changes. <strong><em>(Post construction stage)<br></em></strong><br>10. to provide permanent control points from which particularly important projects can be surveyed - such as regular monitering a construction to check for movement. <strong><em>(Pre construction stage)</em></strong><br><br>11. Survey existing conditions of the future work site, including topography, existing buildings and infrastructure, and underground infrastructure whenever possible (for example, measuring invert elevations and diameters of sewers at manholes); <strong><em>(construction stage)<br></em></strong><br>12. Stake out lot corners, stake limit of work and stake location of construction trailer (clear of all excavation and construction) <strong><em>(construction stage)<br></em></strong><br>13.&nbsp; &nbsp; &nbsp;Stake out reference points and markers that will guide the construction of new structures<strong><em> (construction stage)</em></strong><br><br>14.&nbsp; &nbsp; &nbsp;Verify the location of structures during construction;<strong><em> (pre-construction stage)<br></em></strong><br>15.&nbsp; &nbsp; &nbsp;Provide horizontal control on multiple floors.<strong><em> (Post construction stage)<br></em></strong><br>16. Conduct an As-Built survey: a survey conducted at the end of the construction project to verify that the work authorized was completed to the specifications set on plans. <strong><em>(Post construction stage)</em></strong></div>]]></description>
         <enclosure url="" />
         <pubDate>2018-04-16 01:55:09 UTC</pubDate>
         <guid>https://padlet.com/asmawan/gkojze7qralk/wish/251968012</guid>
      </item>
      <item>
         <title>Group 4 Chi Ho Neverland</title>
         <author></author>
         <link>https://padlet.com/asmawan/gkojze7qralk/wish/251968428</link>
         <description><![CDATA[<div>1. Pre-Construction stage<br>2. Pre-Construction stage<br>3. Construction stage<br>4. Pre-Construction stage<br>5. pre-construction<br>6. pre-construction<br>7. Construction stage<br>8. Construction stage<br>9. Post-Construction stage<br>10. Construction stage<br>11. Pre-construction stage<br>12. Pre-construction stage<br>13. Construction stage<br>14. Construction stage&nbsp;<br>15. Construction stage<br>16. Post-construction stage</div>]]></description>
         <enclosure url="" />
         <pubDate>2018-04-16 01:57:54 UTC</pubDate>
         <guid>https://padlet.com/asmawan/gkojze7qralk/wish/251968428</guid>
      </item>
   </channel>
</rss>
